Laserfiche WebLink
CONSENT ITEM – 5D <br /> <br />City of Arden Hills <br />City Council Meeting for May26, 2015 <br /> <br />P:\Planning\Planning Cases\2015\PC 15-009 - CUP Amendment - Bethel University - Soccer Building\Memos_Reports_15-009 <br />Page 5 of 8 <br />7. Orderly development of the neighborhood and the City within the general purpose <br />and intent of this ordinance and the Comprehensive Development Plan for the <br />City. <br /> <br /> <br />4. Additional Review <br /> <br />The City Engineer, Fire Marshall, Building Official, Rice Creek Watershed District, and <br />Ramsey County have reviewed the project and have not expressed any objections to the <br />proposal. A Building Permit and Grading and Erosion Control Permit will be required by the <br />City. The structure will be built to meet all building and fire code requirements. <br /> <br /> <br />Findings of Fact <br /> <br />The Planning Commission reviewed Planning Case 15-009 at their regular meeting on May 6, <br />2015. Draft minutes from the meeting are included in Attachment A. The Planning Commission <br />offers the following findings of fact for consideration: <br /> <br />General Findings: <br />1. The property at 3900 Bethel Drive (Bethel University) is located in both the B-1 Limited <br />Business District and the R-1 Single Family Residential District. <br />2. The main campus is located in the B-1 District while the Ona Orth Athletic Field <br />complex is located within the R-1 District. <br />3. The proposed soccer facility building is an auxiliary use to the Bethel University campus, <br />and is permitted under Section 1320.075 Special Requirements of the Single Family <br />Residential (R1) District. <br />4. The proposed structure would be used during soccer events for team meetings and to <br />protect players and associated personnel in inclement weather conditions. <br />5. The building would also house a scorekeeper and photographer area in the upper level to <br />provide an unobstructed view of the playing field. <br />6. The proposed structure would be twenty-three (23) feet in height. <br />7. The exterior finishes and architectural style would be compatible with or match the <br />existing structures on the site. <br />8. The proposed structure would meet all setback requirements. <br />9. The proposed footprint of the structure is 20’ x 60’ or 1,200 square feet in size. <br />10. The proposed structure includes a 400 square foot scoring tower in the upper lever. <br />11. The proposed structure has a total floor area of 1,600 square feet. <br />12. The proposed soccer facility building meets all other requirements of the Zoning Code. <br />13. No additional parking areas, drives, or access points would be created as a result of the <br />proposed project at the Ona Orth Athletic Field complex. <br />