My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-08-15-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2015
>
07-08-15-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 1:06:58 PM
Creation date
8/13/2015 12:32:19 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – May 6, 2015 8 <br /> <br />Additional Findings: <br /> <br />The Commission finds that the proposed PUD amendment does not increase the lighting on <br />site and would in fact decrease the lighting through the dimmer module on the monument <br />sign. <br /> <br />The tubular design of the lighting would diffuse and dim the proposed blue LED lighting. <br /> <br />The motion carried unanimously (5-0). <br /> <br />B. Planning Case 15-009; Conditional Use Permit Amendment – Bethel University – <br />3900 Bethel Drive – Public Hearing <br /> <br />City Planner Streff stated that Bethel University operates under a Conditional Use Permit <br />(CUP) for its Campus Master Plan. As the College comes forward with plans or anticipated <br />projects, they are reviewed against the Campus Master Plan for consistency. While building <br />plans or projects that are consistent with the Campus Master Plan require a site plan review, <br />those not included in the original plan must be approved through a CUP Amendment. In this <br />case, a CUP Amendment is required because the soccer facility building is not on the current <br />Campus Master Plan. If approved the Campus Master Plan would be updated to include the <br />proposed structure on the Ona Orth Athletic Field Complex. <br /> <br />City Planner Streff explained that Bethel University is proposing a Conditional Use Permit <br />(CUP) Amendment in order to construct a soccer facility building with the footprint of 1,200 <br />square feet. The soccer facility building would be located on the Ona Orth Athletic Field <br />Complex, which is located on the west side of Snelling Avenue across from the main campus. <br />The structure would be positioned along the eastern sideline of the soccer field near midfield and <br />adjacent to Snelling Avenue. In addition to the existing soccer field, the complex also includes <br />six (6) tennis courts and one (1) softball field. <br /> <br />City Planner Streff reported that the structure would be approximately twenty-three (23) feet in <br />height and comparable in design to the other structures on the athletic field complex. The exterior <br />finish of the structure would largely consist of horizontal plank siding with brick accents on each <br />corner to match the existing structures on the site. Other exterior materials would include rocked <br />faced block and asphalt shingles. <br /> <br />Site Data <br />Land Use Plan: Public and Institutional <br />Existing Land Use: Public and Institutional <br />Zoning: B-1: Limited Business District (Main Campus) <br />R-1: Single Family Residential (Athletic Complex) <br />Current Lot Sizes: 191.32 Acres (Including athletic complex, the main campus, <br />and part of Lake Valentine) <br />Topography: The elevation generally decreases toward the northwest. <br /> <br />City Planner Streff reviewed the surrounding area, the Plan Evaluation and the Conditional Use <br />Permit Criteria. <br />
The URL can be used to link to this page
Your browser does not support the video tag.