My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-24-04 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes/Packets/(1968 to 2009)
>
1999-2009
>
2004
>
02-24-04 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2024 7:55:02 PM
Creation date
4/7/2016 12:28:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 21.Replaced the three water meters that are used to regulate the <br /> water volume from the City of Roseville. <br /> 22.Repaired five water main breaks. <br /> 23.Established a water system CIP. <br /> 24.Storm Water improvements were made at the following sites; <br /> a. Valentine Park Ditch <br /> b. McClung Ditch <br /> c. Indian Oaks Pond <br /> d. Oak Ave Ditch. <br /> 25.Repaired eight storm water catch basins. <br /> 26.Cleaned and jetted two neighborhoods. <br /> 27.Completed Phase One of the federally mandated Storm Water <br /> Pollution Prevention Plan (SWPPP) which involved public <br /> education. <br /> a. Mailed educational literature to every household. <br /> b. Mailed educational literature to every business. <br /> 28. Karth Lake pumping station installed to regulate the level of the <br /> lake. <br /> . 29. Storm water management improvements were made in the <br /> Karth Lake East & Ingerson neighborhoods in conjunction <br /> with the PMP process. <br /> II. Parks and Trails <br /> 1. New playstructure installed at Royal Hills Park. <br /> 2. Park & Trail maps were updated. <br /> 3. New Park facility installed at Cummings Park. <br /> 4. ADA & field improvements made at Perry Park. <br /> 5. New bleachers and safety fences installed at Royal Hills and <br /> Valentine Hills Parks. <br /> 6. 18 new trail benches installed. <br /> 7. Approximately 1,000 feet of handrails installed along trial <br /> sections. <br /> 8. Wood chipped the trails between Venus & Cty Rd E2. <br /> 9. Created a new trail entrance off of Old 10, north of Cty Rd E2. <br /> 1 O.New trail section installed in Cummings Park. <br /> 11.New trail section installed along Hamline Ave( part of 2003 <br /> PMP Ingerson project) <br /> 12.New trail section installed on the south side of Hwy 96 from <br /> Lexington to N. Snelling Ave. <br /> 13.ADA trail entrance installed at Floral Park. <br />
The URL can be used to link to this page
Your browser does not support the video tag.