Laserfiche WebLink
modifications freshen up the Arden Square pavement and sidewalks to capture <br />more parking efficiency, which in turn will help lease the vacant space to a <br />quality tenant. <br /> <br />In addition, this proposed development concept improves the property’s storm <br />water management system. The Rice Creek Watershed District requires storm <br />water runoff rate control for the 2, 10, and 100 year rainfall events as well as <br />infiltration and water quality treatment, which we propose to accomplish in a <br />subsurface infiltration basin. This basin is shown as a heavy dark line on the <br />enclosed sheet C1. The work will also improve storm water handling from the <br />roof drains by connecting them via underground storm pipe to the catch basin at <br />the property’s southeast corner. <br /> <br />This scope of work will require approximately 60 days to complete. The Owner <br />intends to use McGough Construction to complete the work. The Owner has <br />funds in hand to pay for the proposed improvements. If approved by the City, <br />work will begin as soon as weather allows in the Spring/Summer 2016. <br /> <br />Requested modifications from applicable zoning regulations: <br /> <br />The development concept proposes no modifications in zoning districts or <br />subdivision regulations. The Owner does request approval of the following <br />modifications from the applicable zoning regulations: <br /> <br />This application proposes to replace the prior existing sixteen foot (16’) pylon <br />sign (city approved in site plan for TCF Bank from 1992) with a new, more <br />attractive monument sign for the building’s tenants. See enclosed drawings on A1 <br />Site Plan for design and materials. The Owner respectfully requests a <br />modification from the applicable zoning regulation – which limits height to ten <br />feet (10’) – to approve instead a compromise height of thirteen feet (13’), which is <br />halfway between the replacement sign and the current regulations. Note the <br />design also applies this grandfathered replacement compromise 30% increase to <br />the sign square footage. <br /> <br />This application proposes a landscape lot coverage of 15%, while the applicable <br />zoning regulation requires 20% coverage. Instead of reaching the 20% coverage, <br />the proposed development uses that site area to provide additional parking, the <br />number one priority of leasing consultants in recommendations on how best to <br />position the property for a top quality tenant to lease the now vacant space once <br />occupied by TCF Bank. Ownership believes this request is moderated by a <br />number of factors: The site benefits from 14 mature trees, including one beautiful <br />12’ crab apple at County Road E. All trees will remain, and additional trees and <br />shrubs will be planted, per attached L1 Landscaping Plan. Improvements to the <br />site’s storm water handling will vastly improve existing conditions. Lastly, the <br />improved aesthetic of the property’s new site surfaces, monument sign, trash