Laserfiche WebLink
<br />City of Arden Hills <br />Planning Commission Meeting for June 8, 2016 <br /> <br />P:\Planning\Planning Cases\2016\PC 16-014 - Land O' Lakes - PUD\Memos_Reports_16-014 <br />Page 5 of 15 <br />(619,073 sf) (116,109 sf) (166,553 sf) <br />Landscaping Coverage 35% Min. <br />(722,252 sf) <br />71.55% <br />(1,476,507 sf) <br />64.36% <br />(1,328,119 sf) <br />57.25% <br />(1,238,490 sf) <br />Total Impervious Coverage* 65% Max. <br />(1,341,325 sf) <br />31.39% <br />(647,833 sf) <br />35.64% <br />(735,497 sf) <br />42.75% <br />(882,142 sf) <br />*Total impervious coverage includes the building coverage. <br />**No new structures are being constructed with Phase 1 of the project. The Master PUD and Phase 2 of the project <br />suggests a new 4 story office structure with a footprint of 50,444 square feet. <br />***The lot is 47.37 acres or 2,063,577.7 square feet. <br /> <br />D. Floor Area Ratio (FAR) – Meets Requirements <br /> <br />The FAR is the sum of the gross horizontal area of all floors of a building as measured in <br />square feet from the exterior sides of the exterior walls, but not including covered porches; <br />decks; any space where the average floor-to-ceiling height is less than six feet; attached or <br />detached garages; and other detached accessory structures. FAR is calculated by dividing the <br />sum of all gross horizontal floor areas by the square footage of the lot. <br /> <br />Within the I-1 – Limited Industrial District a total FAR of up to 60% is permitted for <br />structures in this district. Although Phase 1 of the project does not include any new <br />structures, the Master PUD and Phase 2 of the project suggest a new four (4) story office <br />structure with an additional 155,000 square feet. When the future Phase 2 of the project is <br />completed and combined with the existing square footage on the property, a total FAR of <br />20.3% is proposed with approximately 418,800 square feet of floor area. <br /> <br /> Permitted Existing Proposed Phase 1 Future Phase 2 Total <br /> FAR 60% 12.78% --* 7.51% 20.3% <br />Square feet 263,800 --* 155,000 418,800 <br />*No new structures are being constructed with Phase 1 of the project. The Master PUD and Phase 2 of <br />the project suggests a new 4 story office structure that would add approximately 155,000 square feet of <br />floor area. <br />**The lot is 47.37 acres or 2,063,577.7 square feet. <br /> <br />E. Building Height – Meets Requirements <br /> <br />During Phase 1 of the project no additional structures will be constructed on the site. <br />However, as proposed by the Master PUD and future Phase 2 of the project a new four (4) <br />story office building will be constructed on the property and positioned just north of the two <br />(2) existing structures on the site. <br /> <br />The maximum building height within the I-1 – Limited Industrial District Zoning District is <br />35 feet. Flexibility in building height will be required for Phase 2 of the project as a building <br />height of approximately fifty-six (56) feet is being suggested at this time. The original PUD <br />that was approved in 1979 in Planning Case 79-004 permitted the east building to be <br />constructed at a height of fifty-six (56) feet.