My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-03-13 JDA
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2013
>
06-03-13 JDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2017 4:36:36 PM
Creation date
6/12/2017 4:35:58 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Involvement Plan 4 May 2013 <br />Quantitative: <br />·How many people attended the meeting? (based on sign-in sheets) <br />·How many different entities (neighborhoods, agencies, etc) were represented (if a larger meeting)? <br />·How many additional meetings have taken place since the last PIP update? <br />·How many meeting notices were sent? Were any returned? <br />Qualitative: <br />·What kind of feedback was received? Positive or negative? Any common themes or trends? <br />·Was the location of the meeting appropriate? <br />·Have stakeholders expressed any particular challenges regarding their participation in the process? <br />Both quantitative and qualitative measures will be summarized in a meeting summary, which will be drafted following <br />each meeting and submitted to the City for review. Qualitative input will be collected from staff who attended the <br />meeting, via email following each meeting. Specific measures will be discussed as necessary. Updates to the PIP will <br />be made as necessary based on these discussions. <br />Results of the quantitative and qualitative evaluation criteria will be tracked and cumulative results and trends will be <br />considered when subsequent updates to the PIP are made. Any schedule changes will also be reflected in the <br />master project schedule, which will also be updated in the PIP appendix.
The URL can be used to link to this page
Your browser does not support the video tag.