My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-17-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2017
>
08-14-17-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:19:49 AM
Creation date
8/29/2017 2:18:02 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL—AUGUST 14, 2017 5 <br /> Councilmember Holden asked if the neighborhood would be notified of the new signage. <br /> Public Works Director/City Engineer Polka commented the City would be posting signage <br /> notifying the neighborhood of the new stop signs. <br /> The motion carried (5-0). <br /> B. Adopt Resolution 2017-2022 Receiving the Feasibility Report and Calling for <br /> a Public Hearing on Improvements for the 2018 Street and Utility <br /> Improvement Project(2018 PMP) <br /> Public Works Director/City Engineer Polka stated on April 24, 2017 the Council adopted <br /> Resolution 2017-012 ordering the preparation of a Feasibility Report for the 2018 Pavement <br /> Management Program (PMP) project. This 2018 PMP consists of improvements to the following <br /> streets: <br /> Streets proposed for reconstruction: <br /> • Indian Oaks Court between James Avenue and the cul-de-sac <br /> • Indian Oaks Trail between Hamline Avenue N and the cul-de-sac <br /> • W Floral Drive between Hamline Avenue N and the dead end <br /> • James Circle between W Floral Drive and the cul-de-sac <br /> • Gale Circle between W Floral Drive and the cul-de-sac <br /> • Norma Circle between W Floral Drive and the cul-de-sac <br /> Streets proposed for reclamation: <br /> • Wedgewood Drive between Old S.T.H. 10 and the cul-de-sac <br /> • Brueberry Lane between Old S.T.H. 10 and Parkshore Drive <br /> • Parkshore Drive between Old S.T.H. 10 and the cul-de-sac <br /> Public Works Director/City Engineer Polka explained that in accordance with Council <br /> direction, a Feasibility Report has been prepared that details the proposed improvements, <br /> neighborhood impacts, estimated costs and financing for the proposed project. Staff reviewed how <br /> the project would be funded and recommended the Council receive the feasibility report and order <br /> a Public Hearing to be held on September 25, 2017 for the 2018 PMP. <br /> Councilmember Holden asked if the residents were given rough estimates on the project costs at <br /> the recent neighborhood meeting. <br /> Public Works Director/City Engineer Polka reported staff had provided this information to the <br /> neighbors in attendance. <br /> Councilmember Holmes questioned if this project would include curb and gutter. <br /> Public Works Director/City Engineer Polka stated this would be included in the project. <br /> Mayor Grant inquired if the sewer lining was part of the combined project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.