<br /> <br /> <br />Feasibility Report <br />Pavement Management Program <br />2018 Street and Utility Improvement Project <br />City of Arden Hills Project No. 18-STR-065 <br />WSB Project No. R-010111-000 Page 7 <br />2.3 Proposed Improvements <br /> <br /> 2.3.1 Roadway <br /> <br />For Indian Oaks Court, Indian Oaks Trail, West Floral Drive, James Circle, Gale Circle <br />and Norma Circle, the roadway is to be reconstructed with subgrade corrections, a 12- <br />inch sand section, and concrete curb and gutter. This design is based on soil conditions <br />found from the soil borings (see Appendix D) and previous project experience. In these <br />areas, the reconstructed roadway grades will be designed in such a way to minimize <br />impacts to existing neighborhood features such as trees, landscaping, and driveways. <br /> <br />Full depth reclamation of the bituminous roadways and spot curb and gutter repairs are <br />proposed for Wedgewood Circle, Brueberry Lane, and Parkshore Drive. The underlying <br />utility conditions and the existing subgrade beneath the bituminous pavement do not <br />require a full reconstruction of the roadway. <br /> <br />2.3.2 Sanitary Sewer <br /> <br />The proposed sanitary sewer improvements include adjusting existing manholes to allow <br />for the reconstructed roadway grades, partial or full manhole repairs, addressing any joint <br />offsets or sags with new sanitary sewer pipe, and lining sanitary sewer main/services that <br />are experiencing I/I. Due to sags and pipe deformations, spot repairs are needed along <br />the mains on West Floral Drive and Norma Circle. Lining the sanitary sewer with a <br />cured-in-place pipe liner is proposed for the sanitary sewer on Indian Oaks Court and <br />Indian Oaks Trail (west of James Avenue). <br /> <br />2.3.3 Water Main <br /> <br />All existing water main along Wedgewood Circle, Brueberry Lane, and Parkshore Drive <br />is to remain in-place. <br /> <br />New 8-inch PVC water main is proposed along all reconstructed roadways. This main <br />will replace the current, deteriorating line that has experienced breaks within the last few <br />years and that has not been replaced since originally constructed. Hydrants and valves <br />will also be replaced in these areas. <br /> <br /> 2.3.4 Drainage <br /> <br />Reconstruction of the streets provides the opportunity to improve the drainage within the <br />project area through the installation of new or additional storm sewer facilities. Proposed <br />drainage improvements include installing new storm sewer in the Floral and Indian Oaks <br />neighborhoods, reconstructing or replacing existing catch basins in all neighborhoods, <br />and addressing drainage concerns with the pond on Indian Oaks Court. <br /> <br />Storm sewer will also be added along the northeast side of the Floral Park trail to direct <br />the runoff to the existing storm sewer facilities on Norma Avenue.