Laserfiche WebLink
RCWD Permit Number 17-031 <br />h) Provide documentation that an NPDES Permit has been applied for and submitted to the <br />Minnesota Pollution Control Agency(MPCA). <br />Administrative <br />2. Send one final, signed 11x17 sized plan set to the District, and e-mail a full sized pdf copy to both <br />the District and the District Engineer. _ _ _ - _ •- e—_ _ e- -_ -_ _ <br />entr-rrrrances. Include a list of changes that have been made since approval by the RCWD Board. <br />3. Submit a copy of the plat or easements establishing drainage or flowage over stormwater <br />management facilities, stormwater conveyances, ponds, wetlands, on-site floodplain up to the <br />100-year flood elevation, or any other hydrologic feature (if easements are required by the City of <br />Arden Hills). <br />4. The applicant must submit a cash surety of$1,500 along with an original executed escrow <br />agreement acceptable to the District. If the applicant desires an original copy for their records, <br />then two original signed escrow agreements should be submitted. The surety is based on $1,500 <br />for 1.65 acres of disturbance. <br />Stipulations: The permit will be i.sued with the following stipulations as conditions of the permit. By <br />accepting the permit, applicant agrees to these stipulations: <br />1. ' • - - e - - •• - - Z" ." e e• e , - • e- • , -•-•- , - - , - . . - <br />surety. <br />None. <br />Exhibits: <br />1. Revised plan sheet Cl, C2, C3, C4, C5, C6.1, C6.2, C7, and L1 dated 3-5-2018 and received 3- <br />7-2018. <br />2. Schematic for underground tank dated 2-27-2018 and received 3-7-2018 <br />3. Underground rainwater cistern information dated 3-2-2018 and received 3-7-2018 <br />4. Applicant response to City comments dated 3-5-2018 and received 3-7-2018 <br />5. Revised stormwater Calculations, dated 2-14-2018 and received 2-15-2018 containing narrative, <br />drainage maps, HydroCAD report for the 2-year, 10-year, 100-year, and 100-year back to back <br />rainfall events for proposed and existing conditions <br />6. Revised permit application with new landowner signature dated and received 2-15-2018 <br />7. Revised plan sheet Cl, C2, C3, C4, C5, C6.1, C6.2, and C7 dated 2-12-2018 and received 2-15- <br />2018. <br />8. Soil boring locations dated 4-19-2016 and received 1-25-2018 <br />9. Revised plat dated 1-23-2018 and received 1-25-2018 <br />10. Revised stormwater Calculations, dated and received 1-25-2018, containing narrative, drainage <br />maps, HydroCAD report for the 2-year, 10-year, 100-year, and 100-year back to back rainfall <br />events for proposed and existing conditions <br />Rice Creek Watershed District Page 2 of 4 3/27/2018