My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-25-18-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
06-25-18-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:58:58 AM
Creation date
6/21/2018 3:49:20 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 20, 2018 <br />Ms. Sue Polka, P.E. <br />City of Arden Hills <br />Public Works Director/City Engineer <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br />RE: Colleen Avenue Drainage Improvements <br />Proposal for Preliminary and Final Design Services <br />Dear Ms. Polka: <br />We are pleased to provide you with this proposal for professional engineering and surveying services in <br />support of the Colleen Avenue Drainage Improvement project. Our project understanding and scope of <br />work have been crafted based on our recent conversations, a site meeting with the neighbors and a <br />review of the March 12, 2018 “Indian Oaks Area Downstream Drainage Review” and feasibility report. <br />For this scope of work outlined herein, Bolton & Menk proposes to provide an estimated 335 hours of <br />surveying and engineering professional services for a total estimated, not-to-exceed, fee of $42,142. <br />We understand portions of the drainage improvements identified in the report have been included in <br />the recently awarded 2018 Street & Utility Construction, which is currently under construction. This <br />proposal is for the design of the Colleen Avenue drainage improvements as outlined in the report. We <br />believe the City will find outstanding service and value in our approach to the Colleen Avenue Drainage <br />Improvements project as a result of our client focus, relevant project experience, and our dedication to <br />effective communication with the City and the neighboring property owner partners. <br />Client Focus –A successful project comes from a thorough understanding of your expectations. As an <br />extension of city staff, our staff actively works to understand City and project needs through meaningful <br />communications. We understand the importance of communicating expectations and goals to project <br />stakeholders (residents and staff) and will exceed your expectation to ensure a successful project. <br />Project Experience –Our strength in municipal engineering is derived from our talented and <br />experienced staff, extensive project and design experience, and our dedication to maintaining a <br />relationship with city staff and residents. Our team has provided a high level of engineering service on a <br />variety of City roadway and drainage projects, similar in scope, size and complexity. We are confident <br />our project experience will translate well to the Colleen Avenue Drainage Project for the City.
The URL can be used to link to this page
Your browser does not support the video tag.