My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-16-19 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2010-2019
>
2019
>
07-16-19 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2019 8:15:35 AM
Creation date
7/12/2019 8:15:12 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />_____________________________________________________________________________________________ <br />City of Arden Hills <br />PTRC Meeting for July 18, 2019 <br />P:\Planning\Planning Cases\2019\19-002 - Summit Development - PUD, CPA, RZ, PP, FP <br /> <br />Page 3 of 4 <br /> <br />The Lake Johanna Fire Department is requiring a fire lane to access the south side of the building. <br />The fire lane starts just to the west of the main entrance off the cul-de-sac. The fire lane access is <br />20 feet wide and has a surmountable curb. It is intended to serve a double purpose as both an access <br />road and a public trail. To make the fire lane more of an amenity, the Applicant is proposing to <br />paint shuffleboard courts as shown on the image above. Signage will be placed at the start of the <br />fire lane delineating it from the building access drive. <br /> <br />Park Dedication <br />For a subdivision that results in new dwelling units in excess of eight units per acre, Section <br />1130.08 of the Subdivision Ordinance permits the City to require the applicants to dedicate up to <br />ten percent of the buildable land area in the subdivision or to pay a park dedication fee of up to <br />twenty percent of the property’s land value at the time the final plat is approved. <br /> <br />In 2019, Ramsey County assigned an estimated market value of $745,500 to the three parcels <br />included in this development. State Statutes require the City to use the value of the property prior <br />to development when determining park dedication requirements. This means that the park <br />dedication requirement, if it were paid in a fee, would be $149,100. To meet this obligation, the <br />applicants have proposed to construct a sidewalk along the south side of Parkshore Drive from the <br />end of the cul-de-sac to Snelling Avenue. This creates a connection to the existing trail along <br />Snelling Avenue. The applicant is also proposing to construct a loop, approximately 565 feet in <br />length, in the existing park land. This loop also includes six exercise stations. The cost of these <br />improvements can be deducted from the total park dedication requirements. At this time, staff <br />anticipates the developer will cover the gap between the park dedication requirement and the cost <br />of the improvements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.