TCAAP AUAR Update 11 <br />August 2019 <br />Table 6: 2030 Maximum Development Scenario Peak Hour Mitigation Traffic Analysis Results <br />Intersection 2030 Baseline Max <br />Mitigated AM <br />2030 Baseline Max <br />Mitigated PM <br /> LOS LOS <br />Old Hwy 8 and CR 96 C C <br />CR 96 and SB I-35W Ramp C C <br />CR 96 and NB I-35W Ramp C C <br />Round Lake Rd and CR 96 C C <br />Old Hwy 10 and CR 96 C C <br />CR 96 at US 10 NB Ramp A A <br />CR 96 and TCAAP Property/North Heights <br />Church Access C D <br />CR H and US 10 C D <br />CR H and SB I-35W B B <br />CR H and NB I-35W A C <br />CR I and SB I-35W C C <br />CR I and NB I-35W B B <br />CR I and Old Hwy 8 A A <br />CR I and N Fairview Ave A A <br />As discussed in Section 2, some improvements to the transportation network in the vicinity of <br />the AUAR study area have been completed, including at the I-35W/County Road 96, I- <br />35W/County Road H, and County Road I/Rice Creek Parkway/Old Highway 8 interchanges. <br />These improvements were assumed as part of the 2030 No Build analysis and, therefore, are <br />consistent with the AUAR analysis. <br />5. Mitigation Summary and Update <br />The mitigation measures from the 2014 AUAR are outlined below along with a status update <br />and any additional mitigation identified based on the information in Section 4.2. Mitigation <br />measures are the same under both development scenarios unless noted otherwise. <br />5.1. Permits and Approvals Required <br />Table 7 lists the anticipated permits and approvals that were identified in Table 8-1 of the <br />2014 AUAR along with updates, where applicable. <br />Table 7: Permits and Approvals Required <br />Unit of Government Type of Application/Approval Status <br />US Army Corps of <br />Engineers Section 404 Permit To be applied for <br />Minnesota Pollution <br />Control Agency <br />National Pollutant Discharge Elimination <br />System Stormwater Permit for Construction <br />Activities <br />To be applied for <br />Sanitary Sewer Extension Permit To be applied for <br />Soil and Groundwater Remediation Plan <br />Approval <br />To be applied for, <br />if needed