Laserfiche WebLink
Attachment A <br />Proposal to Provide Engineering Services <br />To: Mr. Todd Blomstrom <br />Public Works Director/City Engineer <br />City of Arden Hills <br />From: Sean Delmore, PE, PTOE <br />Erik Seiberlich, Project Manager <br />Date: July 30, 2019 <br />Re: Scope and Cost Estimate for Lake Valentine Roadway Improvement Recommendations Study <br />The City is currently working with Mounds View Public Schools and Wold Architects & Engineers on site <br />developments for the Mounds View High School on Valentine Road. As part of the school development <br />process, a traffic and parking lot study was completed by Wenck in May of 2019. The City of Arden Hills <br />has received negative comments about the future site plan and is very concerned about the limited scope <br />of that study as well as the safety and operational deficiencies in some of the key recommendations. <br />WSB was asked to develop a more comprehensive set of recommendations based on a broader look at <br />the area rather than try to fit recommendations in to the existing constraints of the Lake Valentine Road <br />corridor. This broader look assumes that geometric revisions can be made to the existing roadway and <br />parking lot entrances. Also, recommendations will be made for modifications to the north parking lot and <br />entrance area (future parent drop off) to the school to enhance the safety and operations of the future <br />pedestrian crossing. <br />The following is a summarized scope for professional engineering services relating to improvements <br />proposed for Lake Valentine Road in the direct vicinity of Mounds View High School for the City of Arden <br />Hills. This proposal includes data collection, development of concepts for improved circulation, alternative <br />evaluation, and recommendations for site revisions and appropriate traffic control adjacent to Mounds <br />View High School on Lake Valentine Road. The study will be completed in collaboration with the City of <br />Arden Hills and Mounds View Public Schools. The project tasks include: <br />Data Collection — Use video cameras at up to four locations for weekday data collection. The <br />extracted counts will be used along with 2018 data to determine the existing conditions a.m. and <br />p.m. peak hour turning movement counts for use in modeling and analysis. <br />As part of the traffic data collection, WSB staff will collect speed data and perform sight distance <br />calculations to be used for the school speed zone evaluation. Staff will also review the most <br />recent traffic study and document any hazards adjacent to the school and provide information on <br />mitigation. <br />Development of Concepts — The WSB team will create geometric concepts for the area. The <br />concepts will be created based on the results of the traffic analysis and coordination with the City <br />of Arden Hills. We anticipate three (3) concepts will be developed for the area. These concepts <br />may include, but are not limited to, additional turn lanes, approach realignments, entrance <br />relocations, entrance closures, and median additions. WSB will create a preliminary opinion on <br />probable costs for each of the concepts. The concepts will be discussed with the City and further <br />revisions will be made as requested. <br />