Laserfiche WebLink
<br />7 | P a g e <br /> <br />1. Base CAD file (if it exists) <br />2. All available existing site utility plans for the parking lot and surrounding area <br />3. Survey information (if it exists) <br />4. Bid tab, advertisement, and contractor selection and contracting <br />5. Front end specification and City specific information to be included in special provisions <br />6. Garbage service, post office/mail, and fire department coordination for improved <br />services/movements in the parking lot <br />7. Traffic control plan – parking and pedestrian routes during construction <br />8. Carport or canopy coordination for City vehicles <br />9. Geotechnical report (provided by WSB) – basis for pavement design – delivered to HR <br />Green September 19, 2019 <br />10. Onsite construction observation <br /> <br />LEVEL OF EFFORT <br />The total fee for this work will be billed in accordance with the terms of the contract as indicated <br />on the Professional Services Agreement to which this scope and schedule of services is <br />attached. The following task hour table demonstrates the estimated fee for the Arden Hills City <br />Hall Parking Lot Final Design portion of the project. <br /> <br /> <br />Task <br />Project <br />Manager Sr. Engineer <br />Project <br />Engineer/ Sr. <br />Tech. <br />Staff <br />Engineer/ <br />Survey Admin. <br />TOTAL <br />Project Management 12 6 18 <br />Topographic Survey 2 10 12 24 <br />Construction Documents 48 30 98 88 4 268 <br />Construction Admin. 16 2 22 40 <br />Hours 78 30 110 122 10 350 <br />Hourly Rate $145.00 $185.00 $130.00 $115.00 $91.00 <br />Total Labor by Role $11,310.00 $5,550.00 $14,300.00 $14,030.00 $910.00 <br />$46,100.00 <br />Direct Expenses (Mileage, Equipment)$440.00 <br />Project Total Cost $46,540.00 <br />Total Labor - Project <br />Hours by HR Green Team Role