<br /> <br /> <br /> <br /> <br />Shorewood Drive – Storm Sewer Improvements – Final Design Phase <br /> <br />PROJECT UNDERSTANDING <br />The residents at 3203 Shorewood Drive have been experiencing excess overland flows onto their <br />property from the City street. There is a single inlet in the center of the street that receives flow from <br />the newly resurfaced road and bituminous curb. The inlet has a tendency to become clogged during a <br />rain event and flows spread to the lowest lying area, which happens to be the 3203 Shorewood Drive <br />driveway. HR Green has completed an alternatives analysis to reduce impacts to the adjacent private <br />property. Based on the analysis, the City of Arden Hills has requested HR Green complete the design <br />of a stormwater inlet upstream of the 3203 Shorewood Dr. driveway, a raised bituminous driveway with <br />a concrete driveway apron connecting into concrete curb and gutter, and a roughly 15-foot long <br />concrete overflow path for excess water to the channel to Lake Johanna. <br /> <br />DELIVERABLES <br /> <br />HR Green will provide the following deliverables: <br /> <br />1. 90% and Final Construction documents (plan sheets) will include effort for one round of <br />comments from the City after the 90% submittal. Proposed plan sheets are expected to include: <br />a. Title Sheet* <br />b. Layout Sheet* <br />c. Statement of Estimated Quantities* <br />d. Driveway, Street & Overflow Typical Sections <br />e. Standard Plans <br />f. Removal Sheet <br />g. Construction, Erosion Control and Turf Establishment Sheet <br />h. Stormsewer Plan and Profile Sheet <br />i. Overflow Details <br />j. SWPPP Sheets <br /> <br />2. Special provisions* - MnDOT 2018 boiler plate <br /> <br />3. Engineer’s Opinion of Probable Construction Cost <br /> <br />4. Final CAD files in AutoCAD 2019 (unless a different version is requested by the City) <br /> <br />5. Review of shop drawing submittals limited to: storm structures and piping and bituminous or <br />concrete mix. <br /> <br />6. Construction administration includes the following items: <br />a. response to contractor questions during advertisement <br />b. bid opening meeting <br />c. preconstruction meeting with awarded contractor <br />d. construction staking <br />e. material testing coordination for aggregate, bituminous, and concrete. <br />