Laserfiche WebLink
the scope of the proposed street and utility improvements for Snelling Avenue south of County <br /> Road E. This direction will reduce the anticipated subsurface utility work and the corresponding <br /> management of contaminated materials for the project. <br /> The services included in Attachment A will assist the City with managing soil contamination <br /> encountered during construction and obtaining technical assistance and contamination liability <br /> assurances from the MPCA. Staff recommends approval of the WSB proposal. <br /> Budget Impact <br /> The 2020-2024 CIP identifies a total project cost estimate of$4,000,000 for improvements along <br /> Snelling Avenue North from County Road E to Highway 51, which includes the cost of the <br /> potential roundabout and pedestrian trail. The feasibility study for Snelling Avenue North, which <br /> was placed on hold during the environmental investigation work, can now be completed for the <br /> proposed project improvements. Removal of the potential pedestrian trail will reduce the project <br /> cost by approximately $1.1 million or more. The feasibility study and environmental work <br /> described above will be available for Council consideration in November 2020. <br /> Attachments <br /> Attachment A: Scope of Services—RAP/CCP Development <br /> Page 2 of 2 <br />