Laserfiche WebLink
Attachment A <br /> wsb <br /> July 27, 2020 <br /> Todd Blomstrom, PE <br /> City of Arden Hills — Public Works Department <br /> 1245 Highway 96 West <br /> Arden Hills, MN 55112 <br /> Re: Scope of Work and Cost— RAP/CCP Development, MPCA Brownfields Program <br /> Enrollment Services <br /> Old Snelling Avenue and County Road E Improvements <br /> Arden Hills, Minnesota <br /> o Dear Mr. Blomstrom: <br /> U <br /> z <br /> Outlined below is a scope of work and cost estimate for WSB to provide Response Action <br /> m Plan/Construction Contingency Plan (RAP/CCP) Development and Minnesota Pollution Control <br /> Agency (MPCA) Brownfields Program Enrollment services for the proposed Old Snelling Avenue <br /> and County Road (CR) E Improvements project located in Arden Hills, Minnesota (the Site). The <br /> CD Site a north-south segment totaling approximately 0.90 miles in length. The Site extends from <br /> co <br /> Trunk Highway (TH) 51 at the south end to approximately 600 feet north of CR E (approximately <br /> Arden Oaks Drive) at the north end. <br /> M <br /> WSB completed a Phase I Environmental Site Assessment (ESA) at the Site in February 2020. <br /> The Phase I ESA identified the following two recognized environmental conditions (RECs) <br /> `° associated with the Site: <br /> Lo <br /> U) <br /> • REC-1: Soil impacted with polycyclic aromatic hydrocarbons (PAHs) and diesel range <br /> z organics (DRO) was encountered during the replacement of Bridge 62J17 at the southern <br /> �i <br /> end of the Site in 2018. <br /> J <br /> ° 0 REC-2: Petroleum odors were noted during a geotechnical investigation completed at the <br /> a <br /> a W Site in 2019. <br /> z <br /> z <br /> WSB completed a Field Investigation at the Site in May 2020 to determine if the identified RECs <br /> resulted in soil, groundwater, and/or soil vapor impacts at the Site. The Field Investigation <br /> CD <br /> CD identified PAH and DRO impacted soil above MPCA reuse criteria at multiple locations at the <br /> W Site, which will require special management if encountered during construction. No evidence of a <br /> Z) <br /> release was identified in the groundwater and soil vapor samples. <br /> It is our understanding that the proposed underground utility work will include the replacement of <br /> W approximately 1,600 feet of watermain between Skiles Lane and Bussard Court. Proposed <br /> Z) improvements also include a full depth reclamation of Old Snelling Avenue to a depth of <br /> W approximately 12 inches below the roadway surface. <br /> a <br /> a The purpose of this scope is to prepare a RAP/CCP to manage soil contamination encountered <br /> z <br /> X during construction and obtain eligible technical assistance and/or contamination liability <br /> 0 <br /> assurances from the MPCA Brownfields Program. <br /> The following tasks will be performed under this scope of work: <br />