My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-28-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
09-28-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 4:10:49 PM
Creation date
9/24/2020 4:06:33 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills <br />City Council Meeting for September 28, 2020 <br />P:\Planning\Planning Cases\2020\20-010 4200 Round Lake Road PP PUD\CC Packets <br />Page 3 of 9 <br />Proposed Lots Total Acres Use <br />Lot 1 21.94 Development Parcel <br />Lot 2 3.87 Access drive serving Lot 1 and future <br />development on Lot 2 <br />B. Easements and Right of Way <br />The Subject Parcel requires several easements as part of this proposal. The Subject Property is <br />encumbered by existing sightline easements with Clear Channel for two (2) billboards and an <br />overhead power line easement. In addition, the site has existing wetlands located adjacent to 35W <br />and 694 that require drainage and utility easements be placed over the wetlands. <br />The subdivision ordinance requires streets serving commercial and industrial areas to have a right <br />of way (ROW) width of 70 feet. As part of the platting process the Applicant is required to dedicate <br />approximately .41 acres or approximately 17,860 square feet of ROW along Gateway Boulevard <br />to the City. This dedication of ROW impacted parking lot setbacks. The GB zoning district <br />requires a 50 foot setback from public streets. The applicant was requesting a 30 foot parking lot <br />setback from Gateway Boulevard and due to the required ROW dedication, the Applicant is now <br />requesting a 20 foot setback to the parking area on the north side of the subject parcel. However, <br />several properties along Round Lake Road and Gateway Boulevard have similar or greater <br />reduction in parking lot setbacks. <br /> <br />C. Required Improvements <br />All other required improvements, including sewer, water, utilities, and driveway connections to <br />Gateway Boulevard will be constructed in accordance with the City’s Subdivision Code. As a <br />condition of approval, engineering staff shall review and approve final utility and grading plans <br />prior to the issuance of a grading and erosion permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.