My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-28-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
09-28-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 4:10:49 PM
Creation date
9/24/2020 4:06:33 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />City of Arden Hills <br />City Council Meeting for September 28, 2020 <br />P:\Planning\Planning Cases\2020\20-010 4200 Round Lake Road PP PUD\CC Packets <br /> Page 2 of 7 <br />Requested Action <br /> <br />1. Conditional Use Permit <br /> <br />A Conditional Use Permit is required for a warehousing use within the GB District. City Code <br />Section 1355.04 Subd. 3 of the Arden Hills Zoning Code lists the criteria for evaluating a <br />Conditional Use Permit. The Planning Commission and City Council should consider the effect of <br />the proposed use upon the health, safety, convenience and general welfare of the owners and <br />occupants of the surrounding land and the community, in general, including but not limited to the <br />following factors and findings: <br /> <br />1. Existing and anticipated traffic and parking conditions; <br /> <br />A traffic study was required and was completed by Kimley-Horn and Associates. The <br />proposed trip generation is fairly low based on the Applicants proposed use of an <br />office/warehouse use. The traffic study only had one (1) recommended improvement. The <br />recommendation requests Ramsey County to add five (5) seconds to the signal timing for <br />Round Lake Road and Hwy 96 to allow for more northbound left turns during the PM peak <br />hour. As a condition of approval the Applicant shall work with Ramsey County to add five <br />(5) seconds to the signal timing for Round Lake Road and Hwy 96 to allow for more <br />northbound left turns during the PM peak hour prior to the issuance of a certificate of <br />occupancy. <br /> <br />2. Noise, glare, odors, vibration, smoke, dust, air pollution, heat, liquid or solid waste, and <br />other nuisance characteristics; <br /> <br />The proposed use does not conflict with the business functions of the existing businesses <br />and will not pose a significant detrimental risk or nuisance to the health, safety, and <br />general welfare of occupants of surrounding lands. <br /> <br />3. Drainage; <br /> <br />The proposed site plan does not negatively impact drainage on adjacent properties and the <br />submitted stormwater onsite meets the quantity and quality standards. <br /> <br />4. Population density; <br /> <br />The proposed project does not increase population density. <br /> <br />5. Visual and land use compatibility with uses and structures on surrounding land; <br /> <br /> The GB district requires materials and colors selected for any individual building shall be <br />compatible with other buildings in the GB District. The Applicant is proposing to use a <br />color palette similar to the existing buildings on Gateway Boulevard. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.