My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-23-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
11-23-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2020 5:10:32 PM
Creation date
11/19/2020 5:09:17 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3 <br />211828v2 <br />8. A grading as-built and utility as-built plan shall be provided to the City upon completion of <br />grading and utility work. <br />9. The proposed buildings shall conform to all other standards and regulations in the City Code. <br />10. The Applicant shall be financially responsible for all applicable water and sanitary charges. <br />Rates applied shall be those in effect at the time of Final Plat approval and shall be <br />memorialized in the Development Agreement. <br />11. Before construction, grading, or land clearing begins, trees or tree areas that are to be <br />preserved shall be visibly marked and city-approved tree protection fencing or other method <br />shall be installed and maintained at the critical root zones of the trees to be protected. The <br />location of the fencing shall be in conformance with the approved tree preservation plan <br />and approved by staff in writing. <br />12. A Grading and Erosion permit shall be obtained from the city’s Engineering Division prior <br />to commencing any grading, land disturbance or utility activities. The Developer shall be <br />responsible for obtaining any permits necessary from other agencies, including but not <br />limited to, MPCA, Rice Creek Watershed District, and Ramsey County, MNDOT prior to <br />the start of any site activities. <br />13. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and all <br />stormwater runoff, sediments and debris during all construction activities. Temporary <br />stormwater facilities shall be installed to protect the quality aspect of the proposed and <br />existing stormwater facilities prior to and during construction activities. Maintenance of any <br />and all temporary stormwater facilities shall be the responsibility of the Applicant. <br />14. Prior to the issuance Grading and Erosion permit, the Engineering Department shall review <br />and approve final grading and utility plans in writing. <br />15. Staff shall review and approve the final landscaping plan showing a minimum of three trees <br />in the front yard per lot prior to the release of the Final Plat. <br />16. The Applicant shall be financially responsible for any cost incurred for undergrounding <br />existing overhead electric utilities and other associated private utilities and within the <br />development. <br />17. The developer shall be wholly responsible for the removal of debris including dead or <br />deceased vegetation, and fencing found around the site. <br />18. Prior to the release of the Final Plat, the Applicant shall execute the grant of permanent <br />conservation easement and restrictive covenant for wetland and wetland buffer. A
The URL can be used to link to this page
Your browser does not support the video tag.