Laserfiche WebLink
MVHS Trail Improvements – PW-21-0105 <br />January 11, 2021 <br />Page 2 <br /> <br />ǣ̳”‘’‘•ƒŽ•̳”†‡ ‹ŽŽ•̳ʹͲʹͳ ”ƒ‹Ž̳†”ƒˆ– ”ƒ‹ŽǤ†‘…š <br /> <br />Task 1: Project Coordination <br />Bolton & Menk will work in close coordination with the City to develop a project schedule and ensure <br />project deadlines are met. <br /> <br />Subtask 1.1: Project Management <br />Project management activities include project monitoring, conducting project meetings and providing <br />project updates. This task also includes coordinating Geotechnical Engineering support. <br /> <br />Subtask 1.2: City Meetings <br />Bolton & Menk will be available for project update meetings with City staff every two weeks throughout <br />the project. Bolton & Menk will provide status updates on project development and progress. These <br />meetings will be conducted via phone or Microsoft Teams. <br /> <br />We will also attend, and participate as needed in, up to two City Council meetings for the purpose of <br />providing project updates. We anticipate we to attend a council meeting to discuss the preferred layout <br />alternative, as well as present the final plans. <br /> <br />Subtask 1.3: Regulatory Agency Coordination <br />Bolton & Menk will facilitate an initial project meeting with City Staff, Rice Creek Watershed District <br />(RCWD), and other water resources stakeholders, as needed, during the Alternatives Review phase. This <br />will give the project team an opportunity to describe the project, address potential challenges and <br />opportunities, and frame the proposed solution in the context of RCWD permitting requirements. A <br />second meeting will serve as a pre-permit coordination meeting where the final proposed trail alignment, <br />drainage plan, wetland impacts, and stormwater best management practices (BMP) will be presented to <br />RCWD staff for final feedback. It is anticipated meetings with RCWD will be held virtually. <br /> <br />Subtask 1.4: County Coordination <br />Our project team will coordinate with Ramsey County as a part of the project. Our project manager will <br />attend, and facilitate as needed, up to two meetings with Ramsey County. It is expected that these <br />meetings will be conducted via phone or Microsoft Teams. <br /> <br />Task 1 Deliverables: Meeting agendas, meeting minutes <br /> <br />Task 2: Project Survey <br />This task is intended to gather existing topographic, utility, and site feature information. This task also <br />includes wetland services. <br /> <br />Subtask 2.1 Topographic Survey <br />Our team will gather pertinent field information on City infrastructure, right-of-way, private utilities, etc. <br />Underground utility information will be located and illustrated per available as-builts, field markings, and <br />private utility map information facilitated through Gopher State One Call. A base map will be created <br />identifying existing ground and utility features in electronic format. This base map will be utilized as the <br />basis and background for preliminary engineering and final design. <br /> <br />A full topographic survey will be completed from back of curb to five feet beyond right-of-way along <br />Lake Valentine Road and from center of the southbound travel lane to five feet beyond right-of-way along <br />Snelling Avenue. Structure reports will be completed for the handful of storm structures in the southwest <br />quadrant of Lake Valentine Road and Snelling Avenue. <br />