Preliminary Scope of Work <br /> Existing infrastructure conditions within the proposed project area are as follows: <br /> • Streets <br /> o Current pavement condition rating is 31 out of a possible score of 100. The surface <br /> of the streets is in poor condition covered in an extensive amount of cracking. These <br /> streets have seen an increase in needs for pothole filling and patching, therefore <br /> increasing the cost to maintain. <br /> o Core samples from the Pavement Forensic Report resulted in varied conditions from <br /> good to poor but ultimately a majority of the cores were showing signs of <br /> deterioration. <br /> • Sanitary <br /> o Sewer was installed in 1982 as part of the residential development. 8-inch PVC <br /> material was used, and through televising reports, it is in good condition. <br /> o Manhole castings and concrete rings are deteriorating and need repair. <br /> • Water <br /> o Water main was installed in 1982 as part of the residential development. 6-inch <br /> ductile iron pipe was used and this area shows no history of main breaks. <br /> • Storm Drainage <br /> o Storm catch basin structures are deteriorating and need repair. <br /> o Storm sewer pipe needs to be televised to report condition. <br /> o Curb and gutter are generally in good condition but spot replacement is needed in <br /> some areas. <br /> o The southern curb line along Arden Oaks Drive off Snelling Ave to the cul-de-sac <br /> has a noticeable sag, indicating poor subsurface drainage or in need of soil <br /> correction. <br /> Additional research regarding the age and condition of existing infrastructure will be evaluated <br /> during preparation of the feasibility report. Based on the previous information stated, staff <br /> anticipates the project will include the following elements: <br /> ■ Arden Oaks Drive (From Snelling east 400 feet including cul-de-sac): Full-depth <br /> reconstruction of streets with installation of curb, gutter and storm sewer, producing a street <br /> width of 32 feet. Existing ductile iron water main and PVC sanitary sewer to remain in-place. <br /> ■ Arden Oaks Drive (Remainder): Full-depth reclamation of existing pavement, and placement <br /> of new 4-inch bituminous pavement mat, spot repair of damaged curb sections, repair or <br /> replace storm structures. Existing ductile iron water main and PVC sanitary sewer to remain in- <br /> place. <br /> ■ Arden Oaks Circle: Full-depth reclamation of existing pavement, and placement of new 4-inch <br /> bituminous pavement mat, spot repair of damaged curb sections, repair or replace storm <br /> structures. Existing ductile iron water main and PVC sanitary sewer to remain in-place. <br /> Preliminary Project Budget <br /> The cost estimate was derived from the above anticipated project elements listed. The initial cost <br /> estimate is summarized in the following table and will be revised as part of the feasibility report. <br /> Page 2 of 4 <br />