Laserfiche WebLink
Traffic Study <br />Lexington Avenue Reconstruction <br /> <br /> <br />Alliant No. 118-0186.0 30 <br />April 18, 2019 <br />Lexington Avenue & Target South <br />x Alternative 0 (Baseline Improvements) <br />o Install a new traffic signal at the Target South driveway <br />o Relocate Lexington Station access to align with new Target South signal <br />o NB/SB protective/permissive FYA left-turn phasing <br />o EB/WB permissive left-turn phasing <br />o Reconfigure EB/WB to dedicated left-turn lanes and shared through/right-turn lanes <br />x Alternative 1 <br />o Add a dedicated NB right-turn lane <br />x Alternatives 2/3 <br />o No additional improvements <br />x Alternative 4 <br />o Modify Enterprise / Big O Tires / Arby’s driveway to RIRO access <br />x Alternative 5 <br />o Relocate Enterprise / Big O Tires / Arby’s access to align with new Target South signal <br />o Add a dedicated SB right-turn lane <br />Lexington Avenue & Grey Fox Road <br />x Alternative 0 (Baseline Improvements) <br />o NB/SB protective/permissive FYA left-turn phasing <br />o EB/WB protective/permissive FYA left-turn phasing <br />o Reconfigure EB/WB to dedicated left-turn lanes and shared through/right-turn lanes <br />x Alternative 1 <br />o Add a dedicated SB right-turn lane <br />x Alternatives 2/3 <br />o No additional improvements <br />x Alternative 4 <br />o Modify Shannon Square driveway to RIRO access <br />x Alternative 5 <br />o Remove Shannon Square access <br />