My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-13-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
09-13-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2021 8:14:04 AM
Creation date
9/10/2021 8:12:24 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> <br />Budget Impact <br /> <br />From the feasibility report, the current total project cost estimate of $583,000 includes the <br />estimated cost for engineering design and construction services of approximately 15 percent, or <br />$87,450. The proposal provided by TKDA includes fees of $33,365 for design and $26,206 for <br />construction engineering, for a total of $60,500 (Rounded) in consulting fees for the project. <br />Project funding is provided by the PIR fund, water, sanitary sewer and surface water utilities, and <br />special assessments as further described in the feasibility report. <br /> <br />Attachments <br />Attachment A: Proposal for Engineering Services - TKDA
The URL can be used to link to this page
Your browser does not support the video tag.