My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-13-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
09-13-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2021 8:14:04 AM
Creation date
9/10/2021 8:12:24 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Swearingen | Arden Oaks Street Improvements <br />Proposal for Engineering Services <br />September 2, 2021 <br />Page 4 <br /> <br /> <br />2019 Street Improvements, Rosemount, Minnesota <br />As part of the City of Rosemount’s pavement management <br />program, TKDA was hired to provide feasibility study, design, and <br />construction services for the 2019 Street Improvements which <br />were constructed in 2019 and 2020. All eight of the roadways <br />were Municipal State Aid streets totaling over two miles. <br />The street improvements consisted of removal and replacement <br />of any damaged curb, mill and overlay of the bituminous <br />pavement, full depth pavement replacement in areas, over 100 <br />ADA pedestrian ramps, sidewalk improvements, signing and <br />striping, and restoration. Digital signage was installed at a critical <br />intersection. <br />The project was funded with a mix of State Aid Funding and <br />assessments. The assessments were complicated due to the mix <br />of single-family residential, multi-family, and commercial property. Public engagement was an important part of the <br />project to communicate assessment information and project details. Individual meetings with business owners was <br />necessary to communicate and coordinate business access restrictions during construction. <br />III. SERVICES TO BE PROVIDED BY TKDA <br />Work Plan – Design Services <br />A. Project Coordination – TKDA will present materials and answer questions at two (2) City Council meetings <br />and one (1) Public Informational meeting. We will coordinate weekly with City Staff and prepare materials <br />for all project coordination. Project Management will be included in this task. <br />Deliverables: 2 City Council Meetings <br />1 Public Information Meeting <br />Presentation Materials <br />Staff Coordination <br />B. Plan Preparation – TKDA has a good start on the overall plan with our work during the feasibility study. <br />Time is needed to convert the design to a plan set ready for bidding for a reclamation project. <br />Deliverables: Construction Plans <br />C. Specifications – TKDA will utilize and amend Arden Hills Standard Specifications to prepare final <br />specifications for the Arden Oaks project. <br />Deliverables: Construction Specifications <br />D. Cost Estimate – TKDA has already set up the cost estimate for this project. As the plans develop into final <br />plans, the cost estimate would be updated as the project nears bidding. <br />Deliverables: Updated Cost Estimate <br />E. Bidding Services – TKDA will upload the bidding documents to QuestCDN and assist contractors with <br />bidding questions. It is assumed that the CLIENT will advertise the bid in the local paper. If any addendums <br />to the bidding documents are needed, TKDA will complete the addendums. When the bid opening occurs, <br />TKDA will attend the bid opening and tabulate the bids to prepare a recommendation letter. <br />Deliverables: Bidding Services <br />Attending the Bid Opening <br />Bid Tabulation <br />Award Recommendation Letter <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.