My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-24-22-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
10-24-22-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2022 11:25:40 AM
Creation date
10/21/2022 11:20:58 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendment 1 to Professional Services Agreement <br />Arden Manor and Floral Parks Playground Equipment Replacement and Reconstruction Design and <br />Construction Administration Services <br />211646 <br />Page 4 of 4 <br />HRGreeno <br />Items Not Included in the Scope of Work <br />The following items are not included as part of this agreement. Those with an asterisk (*) are considered to be <br />included with the Professional Services Agreement for Arden Manor and Floral Parks Playground Equipment <br />Replacement and Reconstruction Design and Construction Administration Services. <br />- *Review Meeting <br />- *Meetings (50%/90%) <br />- *Progress Meetings <br />- *Bidding Assistance <br />- *Construction Meetings <br />- Construction Survey <br />- Design for irrigation <br />- Design for general site grading <br />- Wetland impact evaluation and mitigation <br />- Repair or replacement of park sign along Royal Lane <br />- Fulltime Construction Observation <br />o Concurrent park construction is assumed <br />o Part time observation is assumed to cover Floral and Arden Manor sites <br />Additional ComDensatio <br />Task 8 — Floral Park Additional Improvements <br />$ 42,069.00 <br />Version1.0 07012017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.