Laserfiche WebLink
6/6/2023 Page 4 of 11 <br />SRF Consulting Group, Inc.Work Tasks and Person-Hour Estimates <br />Client:CITY OF ARDEN HILLS <br />Project:OLD HIGHWAY 10 TRAIL <br />P16750.PP <br />TASK NO.TASK DESCRIPTION DIRECTOR SR. MANAGER DESIGN LEAD ENGINEER III ENGINEER II TECHNICIAN CLERICAL TOTALS EST. FEE <br />SRF Deliverables: <br />The community engagement components account for a community engagement <br />plan, two (2) virtual community meeting, one (1) passive in-person or online <br />survey and social media/website promotions <br />SUBTOTAL - TASK 4 7 13 0 0 34 0 16 70 $9,779 70 <br />$139.70 <br />5.0 Alternatives Review <br />Assumptions: <br />SRF to consider alternatives for roadway (RFP graphics as is, and alternate) <br />An alternative review meeting will be held to confirm concept prior to design <br />30% Submittal (Refined Concept Layout & Estimate) following this meeting <br />Client Deliverables: <br />5.1 Prepare preliminary layouts/graphics showing alternative trail options, identifying <br />site impacts and proposing project elements <br />3 4 8 24 8 0 0 47 $6,962 <br />5.2 Prepare concept cost estimates to accompany preliminary alternatives 0 2 4 4 4 0 0 14 $2,062 <br />5.3 Attend Alternative Review Meeting with City (2 hrs x 3 staff)2 2 0 2 0 0 0 6 $1,120 <br />5.4 Stormwater Management <br />5.4.1 Review existing drainage conditions, including regulatory requirements, drainage <br />patterns, infrastructure to assess its impact on alternatives <br />0 0 4 0 16 0 0 20 $2,624 <br />5.4.2 Hold an early coordination meeting with RCWD to understand how the rules will <br />impact design <br />2 0 4 0 0 0 0 6 $1,076 <br />5.4.3 Identify BMPs and other potential measures to meet the water quality and <br />floodplain rules <br />2 0 8 0 16 0 0 26 $3,700 <br />5.4.4 Identify storm sewer layout needed to serve new urban section of Old State <br />Highway 10 <br />2 0 12 0 24 0 0 38 $5,324 <br />SRF Deliverables: <br />Graphics and Cost Estimate of Alternative(s) for Review Meeting <br />Refined Concept Graphic and Estimate for Final Approval <br />SUBTOTAL - TASK 5 11 8 40 30 68 0 0 157 $22,868 157 <br />$145.66 <br />6.0 Construction Plans (Including Permitting) <br />Assumptions: <br />Plans will be prepared based on State Aid design standards <br />Plans include State Aid review <br />Specs, Project Manual, Bidding Support, Construction Administration by Future <br />Amendment (NOT INCLUDED) <br />No modification to TH 694 bridges (62716 & 62717) needed or Bridge Office <br />coordination. Below bridge trail accommodations were provided during original <br />bridge construction. <br />SRF CONSULTING GROUP, INC.ENGINEERS AND PLANNERS 16750.PP_Arden Hills Old Highway 10 Costs_edit 051823.xlsx <br />MINNEAPOLIS. MN