My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 01-09-1995
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1990-1999
>
1995
>
CC 01-09-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:07:39 PM
Creation date
11/3/2006 2:13:39 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />Ie <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />I <br /> <br />ARDEN HTT LS CITY COUNCIL=-lANUARY 9. 1995 <br /> <br />4 <br /> <br />MOTION: Hicks moved and Keirn seconded a motion to adopt Resolution #95-07; <br />Establishing County Road F as a Minnesota State Aid Street. The motion carried <br />unanimously (5-0). <br /> <br />MINNESOTA ARMY NATIONAL GUARD UTILITY CONNECTION REQUEST. <br /> <br />Superintendent Winkel presented a brief background to the request of from the Army National <br />Guard Reserve for permission to connect to the Arden Hills sanitary sewer and water systems. <br />Mr. Winkel indicated the proposed connections are in the area of I-Tamline Avenue and Highway <br />96. <br /> <br />Mr. Winkel indicated staff has various issues that need further review prior to final report to <br />Council. Mr. Winkel presented the Council with the following issues: <br /> <br />A. Staff is discussing a connection agreement with City Attorney Filla that will be <br />presented to the National Guard Reserve for approval. The agreement should <br />include future ownership and maintenance responsibilities. <br /> <br />B. The proposed plans indicated that only one jacking would be done under Highway. <br />96, and that both the sewer and water pipes be installed in one 30 inch casing. <br />Staff proposes that two jackings be done, one each for sewer and water. <br /> <br />C. The current proposal shows a 10 inch water main extended to the National Guard <br />facility. Staff reco=ends that 12 inch water main be used. This will muimi71' <br />the amount of available water to the site. <br /> <br />D. The proposal also has two options for the sanitary sewer connection. The <br />National guard prefers option n A n which would require the sewage to flow into <br />a City lift station in the Karch Lake area. Staff prefers Option "B n that empties the <br />sewage directly into a gravity flow manhole, and will not need additional <br />pumpmg. <br /> <br />E. Staff will also review the proposed lift station and force main sizes. In order to <br />mayimi71' the amount of sewage that could be discharged from the TCAAP <br />property, both the lift station and force sizes could be increased. <br /> <br />F. An alternate sewer discharge site is also being reviewed. There are manholes <br />available at Old Snelling and Highway 96 that may be capable of handling higher <br />flow rates. <br />
The URL can be used to link to this page
Your browser does not support the video tag.