Laserfiche WebLink
<br /> Minutes of the Arden Hills Regular Cormcil Meeting, 4-9-90 <br /> Page 4 . <br /> BIDS (Cont'd) Malone moved, seconded by Mah~ld, to award the bid for <br /> the 1990 Diseased Tree Removal contract to the lowest . <br /> responsible bidder, outside Services, Inc., in the amount of $2,639.50, pending <br /> satisfactory reference checks. Motion carried 1.lllan:irnously. (3-0) <br /> RES. #90-18; Council was referred to a report from the Clerk <br /> AMEND RES. 90-03, Administrator date::l 4-4-90, relative to a request from <br /> INVES'IMENTS Treasurer Green to designate additional brokerage finns <br /> for investments in Federal goverrrrnent instruments. <br /> Treasurer Green explained, the amended resolution includes the 4M FUnd and allows <br /> the City more flexibility-with investment options. <br /> Mah~ld moved, seconded by Malone, to adopt Resolution <br /> No. 90-18, AMENDING RESOLVI'ION NO. 90-03, DESIGNATING BROKERAGE FIRMS FOR <br /> INVES'IMENT IN FEDERAL GOVERNMENT INSTRUMENTS. Motion carried rman:irnously. (3-0) <br /> CASE #90-02; SUP Cormcil was referre::l to the Planner's report and Planning <br /> GROUP HEALTH, INC, Cormnission minutes dated 4-4-90, relative to the <br /> NORI'Hl'KlODS DRIVE, application for a Special Use Pennit to operate a Me::lical <br /> OPUS CDRPORATION Clinic in an 1-2 District, wt Combination and site Plan <br /> Approval, Northwoods Drive, Opus Corporation. <br /> Bergly revieWed the three actions necessary and explained the Planning Cormnission <br /> recormnendations for approval on the three actions, with conditions, as outlined <br /> in the minutes of 4-4-90. . <br /> Cormcil1nernber Malone noted the Planner's report states the SUP and site plan <br /> require no variances, but the proposed sign exceeds the length requirements. <br /> The Planner explaine::l the sign does meet the minimum area requirements although <br /> sign length exceeds requirements. <br /> Malone recalled a sign variance was granted to American Family Insurance on the <br /> adjacent site to acconnnodate their standard identification sign. <br /> cormcil1nernber Mahowald questioned the total acreage on this site; referred to two <br /> separate figures shown in the d=umentation. <br /> The Project Manager advised the total acreage for this site is 5.95 acres. <br /> Cormcil1nernber Malone questioned if the applicant has received a copy of the <br /> Building Inspector's letter of 3-26-90, which lists several concerns relative to <br /> this site. <br /> The Project Manager stated he has discussed the letter with the Building <br /> Inspector and reviewed all concerns listed. <br /> Malone questioned the extension of Northwocxls Drive along the periJneter of the <br /> Opus property and the adjacent property to the west. <br /> Planner Bergly advised the preliminary plat of this area showed Northwoods as a . <br /> looped street and OUtlot A will have to be platted prior to development; the City <br /> will have to review and approve the platting of this area prior to development. <br /> The Project Manager explained that Opus does not cu=ently own or control the <br /> property identified as OUtlot A. <br /> ------- <br />