My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-10-1992
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1992
>
CCP 02-10-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:08:46 PM
Creation date
11/3/2006 3:53:29 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />~ direct runoff into an existing ponding area on his property. Condemnation <br /> proceedings are also being pursued in the event that an easement settlement <br /> cannot be reached. The condemnation hearing is scheduled for mid-February 1992. <br />I The easements sought from Mr. Reiling are shown by Exhibit 4 and include both <br />I permanent and temporary construction easements. <br />I The construction plans have been forwarded to the Rice Creek Watershed District <br />I and the U.S. Army Corps of Engineers for their review and comments. Permits <br /> from these organizations will be obtained if required. <br />I <br /> ESTIMATED COSTS <br />I The estimated construction and project cost for the proposed improvements are <br />I provided in Table 1. Bids for this project have been advertised and will be <br /> received at the February 10, 1992 City Council meeting. <br />. <br /> The estimated overhead items have been calculated at 32% of the construction <br />I cost, as detailed in the City's Assessment Manual. These overhead costs include <br />I City Administration, engineering, inspection, legal and fiscal costs incurred by <br /> the project. <br />I TABLE 1 <br />I Construction Costs <br /> Keithson Pond Grading & Wier Construction $ 6,000 <br />I Reiling Property Grading, Wier Construction 30,100 <br /> and Storm Sewer Improvements <br /> Estimated Construction Cost $36,100 <br />I Administration, Engineering, Fiscal & Legal (32%) 11,500 <br /> Estimated Total Project Cost $47,600 <br />I These estimated costs do not include any monies for easement acquisition <br />f from the Reiling property, as the costs are unknown at this time. <br /> 4 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.