My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-22-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
04-22-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2024 9:28:10 AM
Creation date
4/19/2024 9:25:38 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Budget Impact <br />Materials testing for this project is budgeted for $30,000 as shown in the project cost breakdown <br />below. The Braun Intertec proposal fee total is $26,322 which is within budget. <br />Total As -Bid Expenses <br />Construction Contract: <br />$ 2,238,418.15 <br />Engineering Feasibility & Design: $ <br />213,457.00 <br />Construction Mgmt: <br />$ <br />128.299.00 <br />Gen Admin & Legal: <br />$ <br />8,775.08 <br />Material Testing: <br />$ <br />30,000.00 <br />Const. Contingency: <br />$ <br />223,841.82 <br />Total Project Cost: <br />$ 2,842,791.05 <br />Attachments <br />Attachment A: Braun Intertec Proposal <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.