My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-22-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
04-22-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2024 9:28:10 AM
Creation date
4/19/2024 9:25:38 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BR A U N Braun Intertec Corporation Phone: 952.995.2000 <br />Re: Proposal for Construction Materials Testing Services <br />2024 PMP Street & Utility Improvements <br />Various Streets from Snelling Avenue North to Hamline Avenue North and Hwy 10 to Co Rd 96 W <br />City Project #24-0100 <br />Arden Hills, Minnesota <br />I NTE RTEC <br />The Science You Build On. <br />March 1, 2024 <br />David Swearingen, PE <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br />Dear Mr. Swearingen: <br />11001 Hampshire Avenue S Fax: 952.995.2020 <br />Minneapolis, MN 55438 Web: braunintertec.com <br />Attachment A <br />Proposal QTB191906 <br />Braun Intertec Corporation is pleased to submit this proposal to provide construction materials testing <br />services for the 2024 PMP Street &Utility Improvements Project in Arden Hills, Minnesota. <br />We have completed the pavement, geotechnical and pond sediment evaluation, so we have a unique <br />understanding of the site and construction challenges. We can aid the construction team by applying this <br />experience and transferring our knowledge developed during the design phase which will provide <br />professional continuity to the construction. Our work on the project to date gives us familiarity with the <br />project team and design development which allows us to understand some of the considerations used <br />when developing the project's design. <br />Since our inception in 1957, we have grown into one of the largest employee -owned engineering firms in <br />the nation. With more than 1,000 employee owners, retaining our firm gives you access to a diverse <br />range of services and professionals you can consult with if the unforeseen occurs. The size of our <br />company also allows us to respond quickly when schedule constraints occur. <br />Our Understanding of Project <br />This is a City of Arden Hills project that will include bituminous mill and overlay along Arden Vista Court, <br />Briarknoll Circle, Briarknoll Drive, Colleen Circle, McClung Drive, Royal Lane and full depth reclamation <br />along Briarknoll Drive, Colleen Avenue, James Avenue, Keithson Drive, Norma Avenue and Royal Hills <br />Drive. The mill an overlay portion of this project will include milling off 2 inches of bituminous and paving <br />2 inches of bituminous in its place, along with spot curb and gutter concrete replacements. The full depth <br />reclamation portion of this project will include full depth reclaiming a minimum of 5 inches of existing <br />pavement and underlying apparent aggregate base to be used as the new base material over new <br />bituminous pavement. Spot concrete sidewalk, curb and gutter, and driveway replacements will also be a <br />part of this project along with watermain and storm sewer utility improvements. <br />This project also has a bid alternate for trail pavement subgrade preparation and aggregate base <br />placement, new concrete curb and gutter, sidewalk, along with a new bituminous pavement and a <br />AA/EOE <br />
The URL can be used to link to this page
Your browser does not support the video tag.