My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-08-1993
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1993
>
CCP 11-08-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:35 PM
Creation date
11/6/2006 3:05:13 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ~L\l ol,rcu::..r\..:)v:\ rI'\.....Ul CCt'\.u.H.-l".\ .11- -t-;:.hJ . -t..:::or.l] .rC1Ci\.:)\.).\ f1'\..-1..\1 DC.I':.U.H_-1.- -- oJi 'J <br /> 2. Storm sewer main to be located <br /> . underground on the Johnson Property <br /> provided that manholes, as required by <br /> the City's consulting engineer, may be <br /> located at surface level of the Johnson <br /> property. <br /> 3. Two trees currently located within the <br /> easement area shall be removed at the <br /> cost of the City. <br /> 4. The City shall maintain the outlet of a <br /> storm water pipe on the Johnson property <br /> so as to remove any drainage silt that <br /> may be deposited from the storm water <br /> pipe into the channel water course <br /> adjacent to the Johnson Property. <br /> 5. The project shall be constructed at no <br /> cost to Johnson and the City shall save <br /> Johnson harmless from the payment of any <br /> and all costs or assessments related to <br /> the Improvement Project. <br /> c. Identification and acquisition of additional storm <br /> sewer improvement easements from Mr. and Mrs. <br /> . Lundgren and Mr. and Mrs. Lis at no cost to the <br /> City. <br /> d. The construction of the Improvement project within <br /> the easQment area pursuant to plans and <br /> spec:if:icatlons approved by the City's consulting <br /> engineer which are attached as Exhibit A <br /> (hereinafter "Approved Plans and Specifications"). <br /> 3. Bongard and Noyed have received a quote from the Plymouth <br /> Plumbing Company (hereinafter "Contractor") which indicates <br /> that the Improvement Project can be constructed according to <br /> the Approved Plans and Specifications for the estimated cost <br /> -of $14,000.00. <br /> 4. In reliance upon the above representations and in <br /> consideration of the mutual undertakings herein expressed, the <br /> parties agree as follows: <br /> 4.1 Cqnstruction Contract.. <br /> Bongard and Noyed agree to contract with the contractor <br /> for the construction of the Improvement projeot. The <br /> Contractor shall provide proof of liability insurance, a <br /> performance bond and a payment bond in a form acceptable <br /> to the City's attorney. <br /> . 2 <br /> ~-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.