My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-26-1994
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1994
>
CCP 09-26-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:00 PM
Creation date
11/6/2006 3:35:36 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ARDEN HILLS CITY COUNCIL - SEPTEMBER 12, 1994 8 <br /> . 7, 1994. The motion carried unanimously (4-0). <br /> Malone asked the status of reconstructing Cannon A venue. <br /> Winkel stated that Cannon is among the top three or four priority streets for reconstruction work. <br /> If County Road F and Stowe are done, Cannon will not be done next year. <br /> ADMINISTRATOR COMMENTS <br /> There were none. <br /> COUNCIL COMMENTS <br /> Aplikowski noted that Valentine Park looks good. She expressed concern about the ground <br /> leveling and water that is standing. She would like to see it drain before the asphalt is put in. <br /> Otherwise, the water will puddle on the asphalt. Also, she reminded staff to put an outside <br /> electrical outlet on the building. <br /> Hicks asked if there is another way to enter the Freeway Park on County Road E. <br /> . Severtson stated that there is access from the south end on Glen Arden Road. <br /> Mayor Probst asked if it would work to put up volleyball nets when the four hockey rinks at <br /> Freeway Park are not in use. <br /> Severtson stated that there was discussion about paving that area of the park. She did not see <br /> a problem with volleyball nets. <br /> Mayor Probst asked the reason for not allowing parking by Freeway park. <br /> Severtson stated there has not been a need because there is not much use of the upper end of the <br /> park by the playground. <br /> Malone noted the rate raise of 5 % by the Board of Water Commissioners. <br /> Mr. Post stated that the increase is $.05 on the first one million cubic feet of water. Arden Hills <br /> is able to take advantage of Roseville' s wholesale rate, and the increase is less than 5 % . <br /> Malone stated that the Board has hired a full-time public relations person, and he would hate to <br /> see a rate increase pay for that salary. He would also not like to see a metering system that the <br /> Board has proposed. <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.