My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-22-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
07-22-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2024 2:03:26 PM
Creation date
7/19/2024 9:44:36 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. Provide vehicle turning paths for review by the City Engineer. <br />15. Construction equipment staging and traffic shall not significantly impact Pine Tree Drive <br />or any Public roadway. <br />GRADING AND EROSION CONTROL <br />1. City inspector may request additional or modifications to BMPs as needed during <br />construction. <br />UTILITIES <br />1. Utilities to be installed using the City of Arden Hills Design Standards. <br />2. City tracer wire specifications will be required for water/sewer services. <br />3. A detailed work plan will be required prior to the City authorizing connection to the 16" <br />diameter water main within Pine Tree Drive due to the critical function of this water main. <br />4. Proposed extensions of water main and sanitary sewer constructed shall be private utility <br />services. Public utility easements will not be required over private water and sanitary sewer <br />utilities within the site. <br />5. Install plug on newly constructed sanitary at the connection point to the existing sanitary <br />structure. Plug may be removed once the sewer has been tested, approved by the <br />inspector, and cleaned of debris. <br />6. Callout emergency overflow for ponds and wetlands. <br />7. Adjust catch basin impacted by the southern driveway access at the southern tie-in. <br />HARD SURFACE <br />1. Repair all street pavement, striping and curb damaged during construction. <br />2. All City pavement sections disturbed must be replaced to existing conditions with like materials <br />and approved mix designs by the City Engineer. <br />The applicant should respond in writing as to how the above comments will be addressed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.