Laserfiche WebLink
<br />Page 20 of 24 <br /> <br />Public Works Director/City Engineer <br />The Public Works Director/City Engineer has reviewed the plans. The following comments have <br />been provided: <br />• Applicant shall apply for a City Grading and Erosion Control permit and submit the total <br />area of reconstructed surface. <br />• Applicant shall contact Rice Creek Watershed District to verify if a watershed permit is <br />needed. <br />• The City has received complaints of vehicle traffic that exits this property. The complaint <br />is vehicles do not stop or yield while existing which causes issues with traffic on Connelly <br />Avenue. <br /> <br />Fire Marshal <br />The Fire Marshal is currently reviewing the plans. No additional conditions have been included at <br />this time. <br /> <br />Findings of Fact <br /> <br />Zoning Code Text Amendment Findings: <br />1. Rose Kukwa, the Applicant, is proposing amendments to the language of Chapter 13 – <br />Zoning Code of the City Code. <br />2. Under the City’s Zoning Code Section 1305.04, Definitions, the City does not define an <br />event center use. <br />3. The Applicant is proposing an amendment to define an event center and allow for the use <br />in the B-2 General Business District through a conditional use permit. <br />4. The Applicant is proposing additional criteria in the ordinance language to establish a <br />minimum parking requirement of 1 parking per 3 seats at design capacity. <br />5. Of local communities surveyed, the majority allow an event center use through a <br />conditional use permit in at least one commercial zoning district. <br />6. Amendments to the Zoning Code regulations require a public hearing prior to action by the <br />City Council. <br /> <br />Planned Unit Development and Conditional Use Permit Findings: <br />1. The property located at 3776 Connelly Avenue is designated for Community Mixed uses <br />on the 2040 Comprehensive Plan. <br />2. New building construction or site modification identified requires the submittal of a Site <br />Plan Review application prior to construction. <br />3. For proposals for new construction, redevelopment of a site, and significant <br />modifications to existing sites a PUD is required. <br />4. The PUD process allows for flexibility within the City’s regulations through a negotiated <br />process with a Developer. <br />5. The Applicant has proposed a Master and Final Planned Unit Development for the <br />development of one approximate 11,000 square foot event center with additional <br />restaurant and adult day care uses on the Subject Property. <br />6. The Applicant has proposed a phased development plan with Phase I referred to as the <br />event center to be established following the land use approvals herein, Phase II referred <br />to as the restaurant to be established directly following Phase I and for Phase III referred <br />to as the adult day care to be established approximately one (1) year later,