Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />22 <br /> <br />. <br /> <br />althouoh we would have no immediate service I think it is <br />. <br /> <br />important enough to the property and speaking purely from a <br />selfish viewpoint I feel it is an asset to the property and good <br />for Arden lllills also. Thank you. <br />liPS. STE?HEN PRf..GER, 3320 North Dunlap: First of all, <br />can you tell me how rrany companies are asked to bid on the project? <br />~R. WILLIAM BANISTER, Banister Engineering Company: This is <br /> <br />advertised by law in the Construction Bulletin, which is a trade jour- <br /> <br /> <br />nal, and, of course, ~re is no guarantee as to how many will bid <br /> <br /> <br />but generally speaktng we can average it out that there would be <br /> <br /> <br />10 or 12 bidders which submit bids on the construction of the <br /> <br />project. That will vary. Sometimes it,'s as low as 7 <lnd sometimes <br /> <br />. <br /> <br />as high as 20. <br />MRS. PRAGER: Could you tell what this main lift station is <br /> <br />going to look like? <br />MR. SHORT: I would say at this time and would recommend at <br />this time that the structure should be constructed of concrete <br /> <br />below ground level and should be a brick veneer building above <br />grade; attractive building with a flush roof, projected overhang; <br />be landscaped and shOUld be an attractive building. <br />r.U,YOR ASHRACH: How large would that be? <br />MI. SHGRT: I would say about 12 by 12 or 12 by 16. <br />loR. ED HUSTAD, 1445 Forest Lane: I am for the project, and on <br />the last page of the brochure that we all got in the mail - under <br /> <br />paragraph 4 in the conclusion, "the cost is reasonable and compares <br /> <br />favorably with other metropolitan suburbs". I'd like a few brief <br />remarks on what the experience has been in other suburbs in Ramsey <br />County in the last four years or so. <br />