My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 02-24-1960
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1960-1969
>
1960
>
CC 02-24-1960
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:58 PM
Creation date
11/9/2006 10:45:56 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />27 <br /> <br />resurfacing. <br />wR. RYSGApRD: This is set up as the same specs as Rosevi11e - <br />NR. SHORT: There are no specs at this time but as was the <br />case in Iwprovement Nc. 1 and the hearing for Number 2, there is <br />no street surfacing included within the estimated costs. <br />IIR. POPOVICH: This is the very statement I made before. <br />It's hard to compare unless you're comparing the same thing. You're <br />right on that because you have to know what's included in a project <br />to compare. These other villages are all doing the same thing here. <br />They are not putting in permanent street repair because it's foolish <br />to do it because you know some time you may have water. Falcon <br />Heights had water so it made sense for them to permanently resurface <br />the streets but in a situation like this you have to be careful because <br />there mi3ht be other improvements coming along. <br />~R. PYSGAARD: Falcon Heights installation included stubs <br />to the property line so there was not the necessity to ever dig <br />in:o the streets for sewer construction. <br />IIR. POPUVICH: So does this. <br />hR. BpNISTER: The stubs here to the property line are included. <br />It's pretty much generally accepted that the street repair or street <br />surfacing is going tom more expensive. It's going to cost the <br />property owners or village more if it's done by the sewer contractor <br />if done as part of the sewer job because in spite of all of the <br />compaction that's tried - and Falcon He ights experienced th is if <br />you were there - there is still some settling afterwards and you <br />do not gain the street surface done immediately afterwards that <br />would be gained or obtained if you were to wait a year or two. <br />Secondly, the type of work is different and the contractor - the <br />
The URL can be used to link to this page
Your browser does not support the video tag.