Laserfiche WebLink
The PUD Development Agreement was approved on September 23, 2024. The Applicant is now <br />asking to amend the Planned Unit Development (PUD) Agreement to allow for the west elevation <br />and part of the north elevation of the building to have an exterior material that is not defined as a <br />desirable material. The Applicant is proposing to not replace the exterior materials on the specified <br />elevations and to instead paint the existing concrete block exterior material to match the approved <br />exterior materials of the other elevations. The Applicant has provided a description in the <br />submitted narrative: <br />We are requesting a flexibility to allow painting of the west exterior walls in lieu of the <br />brick shown in the original submittal to the Planning Commission and City Council. <br />The west side of the building, which is the back, is not visible from the public streets to the <br />south and east or from the public parking lot. It is heavily screened by dense vegetation <br />along the west property line. <br />The paint colors would match the previously approved brick colors and be applied in the <br />same locations as the original brick colors. <br />Rendering of East and West Elevations — Event Center <br />Rendering ofSouth and North Elevations — Event Center <br />i i i i li <br />m m <br />xBFCANfi <br />1 <br />I <br />0- <br />0 <br />yNORTH jHRIOR ELEVATION - EVENT SPACE <br />B - 1'-0 <br />Page 2 of 10 <br />/1 NORTH EXTERIOR ELEVATION - LOBBY <br />re' <br />