Laserfiche WebLink
Mr. Swearingen 12025 CIPP Lining <br />Proposal for Engineering Services <br />November 4, 2024 <br />Sewer Interceptor Rehabilitation Phase IV, St. Cloud, MN <br />TKDA assisted the City of St. Cloud with planning, design, and construction administration for the fourth phase in <br />the City's efforts to rehabilitate its sanitary sewer interceptor system. The Phase IV system is a 10,000 linear foot <br />60-inch and 54-inch diameter reinforced concrete pipe that had experienced severe hydrogen sulfide corrosion. <br />TKDA was retained by the City to develop a preliminary design plan to determine the most feasible method of pipe <br />rehabilitation and then, following consensus on that determination, to implement the final design plans for bidding. <br />Following the determination of the lowest qualified bidder, TKDA conducted construction administration throughout <br />the construction phase. <br />TKDA analyzed sewer tapes, record documents, field notes, stakeholder's lists, flow data, existing pipe <br />characteristics, and preliminary construction cost estimates and made a recommendation to implement slip line <br />pipe rehabilitation with some CIPP rehabilitation. The interceptor configuration was determined to be ideal for slip <br />lining rehabilitation, although some CIPP rehabilitation along the route necessitated the bypassing of sewerage. <br />TKDA designed the rehabilitation of the interceptor system with fiberglass pipe to be utilized as the insertion pipe <br />material. Three slip line excavation locations were identified as potential locations where the contractor could begin <br />the slip line effort. The City wanted this project to be completed in a short time frame. As such, TKDA maximized <br />our in-house planning and design capabilities and completed the planning, design, and contractor prequalification <br />process in about five months. <br />III. SERVICES TO BE PROVIDED BY TKDA <br />Work Plan <br />A. Project Plans — TKDA will utilize GIS mapping to create mapping of the project area to communicate project <br />limits and locations. We will review the sanitary sewer televising to determine if other repairs are needed ahead <br />of the CIPP lining process. We will review service laterals for issues and count the number of service laterals <br />that need to be re-established. <br />Deliverables: GIS Plans <br />Review Televising Report <br />B. Project Manual — TKDA will review the City standard specifications for CIPP lining and modify the specifications <br />for the 2025 CIPP Lining Project. A bid form will be created for the project and included in the project manual. <br />Project Manual <br />Deliverables: Advertisement for Bids <br />Bid Form <br />C. Bidding Services — TKDA will handle the bidding for the 2025 CIPP Lining Project including, QuestCDN <br />coordination, bid questions and addenda, bid opening, bid tabulation, and bid recommendation letter. A letter <br />will be drafted (mailed by the City) to communicate to residents within the project area. <br />QuestCDN coordination <br />Bidder Questions / Addenda (as needed) <br />Deliverables: Bid Opening <br />Bid Tabulation <br />Bid Recommendation Letter <br />Project Communication Letter <br />D. Construction Administration and Construction Inspection — TKDA will handle all construction administration of <br />the project, including contract document review, shop drawing review, payment applications, change requests, <br />final payment, and project closeout document review. TKDA will also complete the construction inspection, <br />assuming 30 days of work for this project. Construction inspection needs are dependent on the contractor's <br />schedule and if additional hours are needed for this project, TKDA will work with the City of Arden Hills to revise <br />the number of hours needed for inspection. TKDA will charge for only the hours needed for the project. To <br />provide additional value, TKDA will utilize a trained Technician I for most of the inspection during the project, <br />TKDA <br />