Laserfiche WebLink
ARDEN OAKS PARK <br />BASE BID <br />1 <br />MOBILIZATION <br />10%OF CONSTSRUCTION COST <br />1 <br />LS <br />$3,600.00 <br />$3,600.00 <br />2 <br />REMOVE PLAYGROUND EQUIPMENT <br />1 <br />LS <br />$5,000.00 <br />$5,000.00 <br />3 <br />REMOVE ENGINEERED WOOD FIBER <br />167 <br />CY <br />$15.00 <br />$2,505.00 <br />4 <br />INLET PROTECTION <br />2 <br />EA <br />$300.00 <br />$600.00 <br />5 <br />TOPSOILSTRIP+RESPREAD <br />6" DEPTH, WHERE RESTORATION OCCURS <br />20 <br />CY <br />$30.00 <br />$600.00 <br />6 <br />COMMON EXCAVATION <br />40 <br />CY <br />$40.00 <br />$1,600.00 <br />7 <br />REMOVE BITUMINOUS PAVEMENT <br />237 <br />SY <br />$25.00 <br />$5,925.00 <br />8 <br />REMOVE BASKETBALL HOOP <br />1 <br />EA <br />$500.00 <br />$500.00 <br />9 <br />REMOVE BENCH <br />EA <br />$200.00 <br />10 <br />4" CONCRETE WALK <br />ALL CONC. EXCEPT PED. RAMP <br />350 <br />SF <br />$10.00 <br />$3,500.00 <br />11 <br />INSTALL PICNIC TABLE TYPE 3 <br />EA <br />$400.00 <br />12 <br />INSTALL BENCH <br />EA <br />$400.00 <br />13 <br />INSTALL GAGA BALL PIT <br />EA <br />$1,500.00 <br />14 <br />INSTALL BASKETBALL HOOP <br />INCLUDES FOUNDATION <br />2 <br />EA <br />$1,500.00 <br />$3,000.00 <br />15 <br />SPORT COURT TYPE SP 9.5 WEAR COURSE MIXTURE(SPWEA240C) <br />140 <br />SY <br />$15.00 <br />$2,100.00 <br />16 <br />SPORT COURT TYPE SP 9.5 BINDER COURSE MIXTURE(SPNWB330C) <br />140 <br />SY <br />$15.00 <br />$2,100.00 <br />17 <br />SPORT COURT BITUMINOUS MATERIAL FOR TACK COAT <br />30 <br />GAL <br />$4.00 <br />$120.00 <br />18 <br />ACRYLIC SPORT COURT SURFACING INCLUDING COURT STRIPING <br />140 <br />SY <br />$17.50 <br />$2,450.00 <br />19 <br />TURF RESTORATION <br />0.2 <br />ACRE <br />$6,500.00 <br />$1,300.00 <br />ARDEN <br />OAKS PARK BASE <br />BID SUBTOTAL: <br />$34,900.00 <br />5%CONSTRUCTION CONTINGENCY <br />$1,745.00 <br />TOTAL ESTIMATED ARDEN OAKS PARK BASE BID COSTS <br />$40,825.00 <br />BID ALTERNATE 1 <br />20 <br />COMMON EXCAVATION <br />ALT 1 <br />70 <br />CY <br />$40.00 <br />$2,800.00 <br />21 <br />DETECTABLE WARNING PANEL <br />ALT 1 <br />16 <br />SF <br />$100.00 <br />$1,600.00 <br />22 <br />CONCRETE CURB+ GUTTER (ALL TYPES) <br />ALT1 <br />12 <br />LF <br />$50.00 <br />$600.00 <br />23 <br />6" CONCRETE WALK (PEDESTRIAN RAMP) <br />ALT 1 <br />72 <br />SF <br />$25.00 <br />$1,800.00 <br />24 <br />MEDIUM DUTY BITUMINOUS TRAIL <br />ALT 1 <br />171 <br />SY <br />$50.00 <br />$8,550.00 <br />25 <br />FURNISH+ INSTALL PORTABLE TOILET ENCLOSURE <br />ALT1 <br />1 <br />EA <br />$2,500.00 <br />$2,500.00 <br />26 <br />4" CONCRETE WALK <br />ALT 1 <br />162 <br />SF <br />$10.00 <br />$1,620.00 <br />27 <br />CLEAR +GRUB TREES +SHRUBS <br />ALT1 <br />2 <br />EA <br />$700.00 <br />$1,400.00 <br />BID ALTERNATIVE I SUBTOTAL $20,870.00 <br />5%CONSTRUCTION CONTINGENCY $1,745.00 <br />TOTAL ESTIMATED ARDEN OAKS PARK ALTERNATE BID COSTS $22,615.00 <br />TOTAL ESTIMATED ARDEN OAKS BASE BID + ALTERNATE BID $63,440.00 <br />Engineer's Estimate <br />1/9/2025, 4:45 PM Bolton & Menk, Inc. Page 2 of 2 <br />