Laserfiche WebLink
<br />. . <br /> <br />COUNCILN1lli OUJEN: Said he recalled that the developer was to <br />pay for the cost of roads in that area. Furthur con~nted that it <br />would be cheaper to surface all of the streets in the area at one <br />time. He said there would be no objection to doing each road indiv- <br />idually if the property owners or developer didn't object to the <br />additional cost. <br /> <br />[vJR. STANLEY BERGLUND, 4133 James Circle (Spoke before): Asked <br />ttlhy the curbs and gutters were included in the improvement. 'l'he <br />answer was that they were included for drainage purposes. <br /> <br />~JR. RICHARD 11YERS, 4117 Gale Circle (Spoke before): Said thEY <br />have water on their property due to the drainage of the village park <br />on the ot~er side of Floral Drive. ASked if there were any plans in <br />this imp~ovement to take care of that. <br /> <br />. <br /> <br />COUNCILHAN HOLLENHORST: Asked -,,'ilY there should be a delay in <br />surfacing the roads in the circles. Engineer Christofferson replied <br />it was because of possible settling. Councilman Hollenhorst asked <br />the engineer if, in his opinion, the surfaci.ng should be delayed. <br />~trQ Christo=ferson replied th~t he would not guarantee no settling <br />if the roads ",ere surfaced nO\\". Councilman Hollenhorst then said he <br />dion't believe the property owners on Floral Drive should be subject <br />to a 100% assessment for street resurfacing if the reason for it is <br />due to problems created by the "'lai:er project. Asked how practical <br />it would be to put the street in reasonably good driving condition for <br />a few years without doing the permanent street surfacing. Mr. <br />Christofferson indicated that he had had assurances from the contractor <br />that. they would repair the crossings which are in bad condition. <br /> <br />MR. ROBERT ANDERSON, 1357 Floral Drive: Said that neither the <br />se\!er or water contractors fulfilled their obligations of repairing <br />the streets and it was his understanding that the sewer contractor <br />hadn't been paid in full because of the street work yet to be done. <br />l~. Christofferson said he would check into the matter. <br /> <br />HR. ROBERT HANSEi~, 1465 Floral Drive (Spoke before) : Asked how <br />long the contractors had to complete their jobs. Mr. Christofferson <br />repli.ed it was usually one year but there have been oontractors who <br />have come in after the length of time to !aake repairs. <br /> <br />COUNCILV~N HOLLEl1HORST: Suggested that if the people on James <br />Circle are willing to gamble on the road not settling, he was in <br />favor of putting in that portion of the improvement. <br /> <br />HR. STANELY BERGLUND, 4133 James Circle (Spoke before): Would <br />like to have the road surfaced. <br /> <br />. <br /> <br />3, <br />