My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 10-12-1999
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1990-1999
>
1999
>
CC 10-12-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:11:41 PM
Creation date
11/9/2006 2:39:16 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ARDEN HILLS CITY COUNCIL - OCTOBER 12, 1999 5 <br />. Mr. Brown advised that the City Engineer recommends approval of payment request #6 in the <br /> amount of $30,698.44 to Forest Lake Contracting. A retainage of 5 percent is being hcld for the <br /> project. <br /> Mayor Probst asked if the project would be completed under budget. Mr. Brown stated that, <br /> although there was some additional work to be completed, he did anticipate the project being <br /> completed approximately $20,000 to $30,000 under budget. <br /> MOTION: Councilmember Malone moved and Councilmember Larson seconded a motion to <br /> approve payment request #6 in the amount of $30,698.44 to Forest Lake <br /> Contracting. The motion carried unanimously (5-0). <br /> C. Payment Request #1, McClung Drive/Arden Manor Park, Nadeau Utility, Inc. <br /> Mr. Brown explained that the City Council had before it pay request #1 for Nadeau Utility, Inc. <br /> for the McClung Drive/ Arden Manor Park project. The pay request represented work <br /> accomplished primarily at Arden Manor Park. The work accomplished thus far had been good. <br /> The City Engineer had some concerns about Nadeau Utility, Inc., however, the Contractor has <br /> proven to be diligent. <br /> Grading work at Arden Manor Park has been substantially completed and the basketball court <br /> surfacing was scheduled to occur October 7, 1999. The contractor has constructed the concrete <br />. pad and footings for the new pavilion, which will be delivered and installed in approximately <br /> four weeks. The entire project should be substantially completed within one week, with the <br /> exception of the park shelter installation. <br /> Work along the McClung Drive ditch has begun, including the construction of a new wooden <br /> skimmer adjacent to a pond outlet. As part of the ditch maintenance project, the contractor was <br /> able to perform some emergency work which had been discovered as part of a culvert <br /> replacement. The culvert had eroded substantially since last spring and the contractor was able <br /> to expand the scope of work to include this replacement. <br /> Mr. Brown advised tllat the City Engineer recommends approval of pay request # I in the amount <br /> of$94,405.68 to Nadeau Utility, Inc. A retainage of 5 percent was being hcld for the project. <br /> Councilmember Malone asked if the paperwork for tile land transfer at Arden Manor Mobile <br /> Home Park had been completed. Mr. Post stated that Mr. Husnik was having difficulties finding <br /> the abstract for the title. City staff had contacted Attorney Filla and was informed that there were <br /> other ways to reconstruct the abstract. The cost to prepare this secondary document will be the <br /> responsibility ofMr. Husnik. Councilmember Malone stated that be wanted to ensure that this <br /> issue was not forgotten. <br /> MOTION: Councilmember Malone moved and Councilmember Aplikowski seconded a <br />. motion to approve payment request #1 in the amount of $94,405.68 to Nadeau <br /> Utility, Inc. The motion carried unanimously (5-0). <br />
The URL can be used to link to this page
Your browser does not support the video tag.