Laserfiche WebLink
<br />~tinlltes of Special Counci I ,Ieeting <br />Page four <br /> <br />Apr! I 21, 1975 <br /> <br />Art Hage, Contractor, noted that Mr. Jerry Neisen, General Manager <br />qf Liv-A-Snaps has agreed to fence the mechanical equipment on the roof of <br />existing bui Idlng, as requested by the Planning Commission. <br /> <br />Case No. 75-13, Bradford LemberR - Front Set-back Variance <br />Fredlund referred Counci I to the Planning Commiss-ion Minutes of <br />Apri I 15, 1975, and to the Board of Appeals report dated 4/15/75, <br />recommending Counci I approval of the 6t' front set~back variance. <br /> <br />After discussion Wingert moved, seconded by Woodburn, that on the <br />basis of energy conservation, aesthetic improvement and neighbors <br />approval of the variance, Council approve the 6t foot setback <br />variance, as requested, and recommen:Jeo for approval,by the Planning <br />Commission and Board of Appeals; inside door to be installed as <br />per plans submitted. Motion carried unanimously. <br /> <br />. <br /> <br />Case No. 75-8, Gene Guthmueller - Lot Spilt <br />Fredlund referred Counci I to the Planning Commission Minutes of <br />Apri I I, 1975, reporting that' the Planning Commissl,on recommends <br />Counci I .approval of the Tot split, subject to 3 conditIons: <br />I. Submission of grading plans for lo~s A and B. <br />2. Culverts be ins,t-alled under driveVlays. <br />3. Building Inspector to be notified that Lot B foundation <br />must be taken down to suitable sol I. <br /> <br />After discussion, Wingert moved, seconded by Woodburn, that the <br />Councl I approve the lot split with contingencies recommended by <br />the Planning Commission, except that grading plan be required for <br />lot B only prior to issuance of BuildIng Permit. Motion carried <br />(Wingert, Crepeau, Crichton, Woodburn voting in favor of the motion; <br />Feyereisen abstaining). <br /> <br />(Guthmueller indicated he would agree verbal iy to pedestrian access <br />across the western edge of his lot to Flol-al Parld. <br /> <br />.i <br /> <br />Dumpster Screenl~ <br />Fredlund said screening of ~umpsters is difficult In some situations, <br />but Is desirable for a.3sthe1ic and maintenence r'eaSons. He said <br />screening of dumpsters is a common requirement, not unique to <br />Arden Hi lis. <br /> <br />(Crichton agreed to look, int9 the dumpster screening problems re <br />letter received). <br /> <br />. <br /> <br />Case No. J5-=-?...I. Amended Special Use Permit - Arden Manor <br />Fredlund explained tha~ the site plan presented with the application <br />for an Amended Special Use Permit (Case 75-6), based on the expir- <br />ation of the original Special Use Permit for Arden Manor ("ase no; <br />71-21), Is essentially the SOlme as the origlnal site plan. Fredlund <br />said that Or'cinance 147 (Mobile Home Ordinance) has been adopted <br />since the initial application, with which Arden Manor does not <br />comply (Ord. 147 was passed following application for the original <br />Special Use Permit, but prior to issuance of the Special Use PermitL <br />Provisions of Ordinance No. 147 must be considered re this Amended <br />Special Lse Permit. Fredlunj noted the fol lowing Planning Commission <br />con ce rns: <br />I. Streets and utlllti'3s are in place - lots are tied to the <br />network of the orglnal plan. <br />2. Najority of lots am 4,500 sq.' ft. (Ord. requires 9,000 <br />sq. tT. Rli" Imum. <br />3. LOY w:,~-;-~::; ~re 45' ':Ord. rec;uires 75' wide lots). <br />4. <Installation of homos does hot comply with Grd. i47, <br />whle., requires II concrete slab 2' wider 'than mobile home, <br />or pi i lars (8 on a 51 de) to prevent warping. <br />(Frodlund advised that Adams has submitted standards of <br />the [qinnesota Mobile Home Association which he follows <br />to support homas intArd6n Manor.) <br />5. There is a public pBrk easement to be considered; not <br />part of the former plan. <br />6. Problems stemming from residents of Arden Manor: <br />a) no garbage disposal system <br />b) Incomplete landscaping <br />c) unsatisfactory snow removal <br /> <br />-4- <br />