My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-07-2025 JDA Agenda Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2025
>
04-07-2025 JDA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 4:19:45 PM
Creation date
4/9/2025 4:19:18 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />TW185\1\1011577.v13 <br />issuance of a Certificate of Occupancy, the Developer shall install the fully <br />functioning emergency interconnect. <br />J. Commercial/industrial dedication shall be a cash contribution in lieu of land <br />and calculated based upon the fair market value of Lot 1, Block 1. 6. Park <br />Development shall be a cash contribution in lieu of park and calculated <br />using the fair market value of Lot 1, Block 1, each in the amounts set forth <br />below. <br />K. A separate sign permit shall be required for all signs on the Subject <br />Property. <br />L. A right-of-way permit shall be required for work performed within or <br />impacting the City, Ramsey County, or Minnesota Department of <br />Transportation right-of-way. <br />M. A Grading and Erosion permit shall be obtained from the City’s Engineering <br />Division prior to commencing any grading, land disturbance or utility <br />activities on the Project Site. The Developer shall be responsible for <br />obtaining any permits necessary from other agencies, including but not <br />limited to, MPCA, Rice Creek Watershed District, MnDOT and Ramsey <br />County (i.e., ROW or access) to the extent required for the Project. <br />N. The Project shall be completed in accordance with the Plans. Any material <br />changes to the Plans, as reasonably determined by the JDA Development <br />Director, shall require review and approval by the JDA. <br />O. All items identified in the February 28, 2025, PW/Engineering Division <br />memo listed on Exhibit F attached shall be addressed. All comments shall
The URL can be used to link to this page
Your browser does not support the video tag.