My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-07-2025 JDA Agenda Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2025
>
04-07-2025 JDA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 4:19:45 PM
Creation date
4/9/2025 4:19:18 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />TW185\1\1011577.v13 <br />be adopted herein by reference. <br />P. All items identified in the March 10, 2025, and March 11, 2025, Ramsey <br />County email listed on Exhibit G attached shall be addressed. All <br />comments shall be adopted herein by reference. <br />Q. Final grading, drainage, utility, and site plans (collectively, the “Civil <br />Plans”) shall be subject to approval by the Public Works Director, City <br />Engineer, and Community Development Director prior to the issuance of a <br />grading and erosion control permit or other development permits. <br />R. Upon completion of the Project, a grading as-built and utility as-built survey <br />shall be provided to the City for review. <br />S. Heavy duty silt fence and adequate erosion control around the entire <br />construction site on the Project Site shall be required and maintained by the <br />Developer during construction to ensure that sediment and storm water does <br />not leave the Project Site. <br />T. The Developer shall be responsible for protecting the proposed on-site <br />storm sewer infrastructure and components and any existing storm sewer <br />from exposure to any and all stormwater runoff, sediments and debris <br />during all construction activities on the Project Site and related to the <br />Project. Temporary stormwater facilities shall be installed on the Project <br />Site to protect the quality aspect of the proposed and existing stormwater <br />facilities prior to and during construction activities for the Project.
The URL can be used to link to this page
Your browser does not support the video tag.