My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-07-2025 JDA Agenda Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2025
>
04-07-2025 JDA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 4:19:45 PM
Creation date
4/9/2025 4:19:18 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br />TW185\1\1011577.v13 <br />• MnDOT for State Highway Access <br />• Minnesota Department of Health for Watermains <br />• MPCA for Storm Water Issues, Sanitary Sewer and Hazardous Material <br />Removal and Disposal <br />• DNR for Dewatering <br />• Rice Creek Watershed District <br />• City of Arden Hills for Building Permits <br />• City of Arden Hills Grading and Erosion Control Permit (Escrow will be <br />determined at the time of application) <br />• City of Arden Hills Water and Sewer Connect Permits <br />• NPDES Construction Stormwater Permit <br /> <br />14. DEWATERING. Due to the variable nature of groundwater levels and stormwater <br />flows, it will be the Developer’s and the Developer’s contractors and subcontractors’ responsibility <br />to satisfy themselves with regard to the elevation of groundwater in the area and the level of effort <br />needed to perform dewatering and storm flow routing operations. All dewatering shall be in <br />accordance with all applicable county, state, and federal rules and regulations. DNR regulations <br />regarding appropriations permits shall also be strictly followed. <br />15. TIME OF PERFORMANCE. The Developer shall install all required <br />Infrastructure Improvements by October 31, 2026, with the exception of the final wear course of <br />asphalt on streets and any seasonal installation of landscaping. The final wear course on streets <br />shall be installed before October 15, 2026 (unless a later date is approved in writing by the JDA <br />Engineer), and can be installed in the same season as the base layer of asphalt. The Developer <br />may, however, request an extension of time from the JDA. If an extension is granted, it shall be <br />conditioned upon updating the Security posted by the Developer to reflect cost increases and the <br />extended completion date. Final wear course placement must have the written approval of the <br />JDA’s Engineer and may be delayed or scheduled at any time of the year based upon existing site <br />conditions at the discretion of the JDA’s Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.