My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-07-2025 JDA Agenda Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2025
>
04-07-2025 JDA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 4:19:45 PM
Creation date
4/9/2025 4:19:18 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 <br />TW185\1\1011577.v13 <br />City’s inspector may increase. The JDA will endeavor to notify the Developer in advance of any <br />proposed action, but failure of the JDA to do so will not affect the Developer’s and JDA’s rights <br />or obligations hereunder. If the Developer does not reimburse the JDA for any cost the JDA <br />incurred for such work within thirty (30) days, the JDA may draw down the escrow to pay any <br />costs. No development, street or utility construction will be allowed, and no building permits will <br />be issued unless the plat is in full compliance with the approved erosion control plan. <br />18. GRADING PLAN. The Subject Property shall be graded in accordance with the <br />approved grading development and erosion control plan and related permit. The plan shall <br />conform to City specifications and JDA Official Controls. Within thirty (30) days after completion <br />of the grading the Developer shall provide the City with an “as constructed” grading plan certified <br />by a registered land surveyor or engineer that confirms the final constructed elevations and <br />addresses all items in the engineering review as identified in the February 28, 2025, <br />PW/Engineering Division Memo. Swales, and ditches for public drainage, if applicable, will be <br />constructed on public easements or land owned by the City. Notwithstanding the foregoing, the <br />City may issue a certificate of occupancy to the Developer, prior to completion of all grading, <br />provided the JDA Engineer has determined that adequate erosion control measures are in place. <br />The “as constructed” plan shall include field verified elevations of the following: a) location and <br />elevations along all swales, and ditches; b) wetlands, wetland mitigation areas if any, ditches, <br />locations and dimensions of borrow areas/stockpiles, and installed "conservation area" posts; c) <br />all items as stated within the City Grading and Erosion Control Permit; and d) lot comer elevations. <br />The City will withhold issuance of building permits until the approved certified grading plan is on <br />file with the City and all erosion control measures are in place as determined by the JDA Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.