My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-23-25-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
06-23-25-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2025 8:24:52 AM
Creation date
6/20/2025 7:30:40 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Prepared by: Bolton & Menk, Inc. RIGHT-OF-WAY, EASEMENTS, AND PERMITS <br />2026 PMP Street & Utility Improvements ǀ 25X.137753 Page 16 <br />may be necessary to construct the project. For various work items, minor encroachment onto <br />private property may be beneficial in order to achieve a better overall quality of work. It is <br />assumed that project staff will discuss these with property owners and obtain right-of-entries on a <br />case-by-case basis. These items include water service and curb box installation, sanitary service <br />installation, retaining wall installation, and driveway connections. This will be evaluated in detail <br />towards the end of the final design process to identify any temporary easement or right-of-entry <br />needs, particularly as it relates to the work beyond the roadways. <br />The project area is within the jurisdiction of the Rice Creek Watershed District (RCWD) and <br />therefore requires compliance with their rules and regulations. A meeting was held with RCWD <br />staff on May 29th, 2025 to understand how their rules and regulations apply to the proposed <br />project. The project falls under the Public Linear Project category for Stormwater Management <br />rules and therefore stormwater management is not required unless the project disturbs one acre <br />or more of new or reconstructed impervious surface’s underlying native soils. Being that the <br />project is primarily a rehabilitation project and plans to leave the existing base pavement, <br />aggregate base, and/or reclamation material in place, the disturbance to underlying native soils <br />where impervious surface is proposed is currently calculated to be under the one-acre threshold <br />and stormwater management permitting is not anticipated. An Erosion & Sediment Control Plan <br />permit will be required through the RCWD associated with the project’s erosion control plan. <br />A wetland delineation was conducted during the spring of 2025 to identify the wetlands <br />surrounding the proposed improvements and submitted to the appropriate agencies for <br />concurrence of wetland types and boundaries. Permitting associated with anticipated wetland <br />impacts will be submitted to the appropriate agencies for approval at the conclusion of final <br />design and is expected to meet the conditions for a temporary impact permit associated with the <br />Wetland Conservation Act (WCA) requirements. <br />Karth Lake is identified as a Public Water and therefore additional permitting is required for the <br />dewatering of Karth Lake associated with the accumulated sediment removal work, if approved. <br />This will require, at a minimum, a Minnesota Department of Natural Resources (MnDNR) Public <br />Waters Work Permit. Additionally, existing, adjacent wetlands have potential additional associated <br />permitting needs related to the accumulated sediment removal work, if approved. It is <br />recommended the project’s final design scope be modified to complete the necessary topographic <br />surveys and wetland delineations to move forward with the proposed backyard storm sewer <br />improvement work, if approved for final design. <br />• MPCA Construction Stormwater Permit <br />• MDH Public Watermain Plan Review Permit <br />• Ramsey County ROW Permit <br />• RCWD Erosion & Sediment Control Permit (Rule D) <br />• RCWD Floodplain Alteration Permit (Rule E) <br />• RCWD Appropriation of Public Waters (Rule J) <br />• WCA Permits & RCWD Wetland Alteration (Rule F) <br />• MnDNR Public Waters Work Permit <br />o Including confirmation of any adjustments to the city’s existing permit for <br />pumping operations due to adjusting the OHWL <br />DRAFT
The URL can be used to link to this page
Your browser does not support the video tag.