Laserfiche WebLink
<br />Prepared by: Bolton & Menk, Inc. ESTIMATED COSTS <br />2026 PMP Street & Utility Improvements ǀ 25X.137753 Page 17 <br />VII. ESTIMATED COSTS <br />Detailed estimates of probable construction costs have been prepared for the improvements <br />described in this report and are included in Appendix B. All costs are based on anticipated unit <br />prices for the 2026 construction season based on actual bid prices for similar projects. Actual costs <br />will be determined through competitive bids following the final design for the project. All <br />estimated costs also include a 10% contingency and 27% overhead allowance for legal, <br />engineering, administrative, and finance costs. Table 2 below contains a summary of the <br />estimated total project costs for the recommended base project improvements, inclusive of <br />construction costs, contingency, and overhead allowance. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />One design alternate was evaluated as part of the preliminary design for the potential removal of <br />accumulated sediment at five delta locations in Karth Lake. Also, three options were evaluated for <br />improvements to the Karth Lake pump system to better monitor the lake level and possibly <br />automate the pump operations. A summary of the estimated project costs associated with the <br />design alternate and the estimated project costs associated with the three design options is <br />presented in Table 3 below (includes 10% contingency and 27% overhead). <br /> <br />Table 3 – Estimated Alternate Project Costs <br />Proposed Improvements Karth Lake Total Construction Costs <br />Alternate 1 - Karth Lake <br />Sediment Removal $575,000 $575,000 <br />Option 1 – Karth Lake Pump <br />System Improvements $14,000 $14,000 <br />Option 2 – Karth Lake Pump <br />System Improvements $112,000 $112,000 <br />Option 3 – Karth Lake Pump <br />System Improvements $500,000+ $500,000+ <br /> <br />It is planned to bid the project with a bid alternate for the Karth Lake dredging work and the Karth <br />Lake pump system improvements, if approved. This will allow flexibility to include or remove these <br />work items from the project based on the actual prices bid by the contractor to complete the <br />work. <br />Table 2 – Estimated Base Project Costs <br />Proposed <br />Improvements <br />Residential <br />Mill & <br />Overlay <br />Areas <br />Residential <br />Reclamation <br />Areas <br />Industrial <br />Reclamation <br />Areas <br />Trails & <br />Retaining <br />Wall Karth Lake <br />Total <br />Project <br />Costs <br />Streets $163,000 $1,229,000 $401,000 - - $1,793,000 <br />Storm Sewer $55,000 $148,000 $13,000 - - $216,000 <br />Sanitary Sewer $23,000 $152,000 $11,000 - - $186,000 <br />Watermain $49,000 $344,000 $74,000 - - $467,000 <br />Trails - - - $248,000 - $248,000 <br />Karth Lake - - - - $179,000 $179,000 <br />Total Project <br />Costs <br />$290,000 $1,873,000 $499,000 $248,000 $179,000 $3,089,000 <br />DRAFT